Filter interviews by
I applied via Campus Placement and was interviewed before Jan 2021. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Aug 2021. There were 2 interview rounds.
Verbal and reasoning questions
I applied via Campus Placement and was interviewed before Aug 2021. There were 2 interview rounds.
IS Code provisions and methods for concrete mix
IS 456:2000 is the code for plain and reinforced concrete
IS 10262:2009 is the code for concrete mix design
Proportions of cement, sand, and aggregates are specified in the code
Water-cement ratio, workability, and compressive strength are also specified
Methods for mixing, transporting, placing, and curing of concrete are given
L&T Construction interview questions for designations
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
Get interview-ready with Top L&T Construction Interview Questions
Structural components in a room
Walls
Ceiling
Floor
Doors
Windows
Beams
Columns
Trusses
Joists
Braces
I am a dedicated and hardworking individual with a passion for learning and growth.
I have a background in marketing and have worked in the industry for 5 years.
I am currently pursuing a degree in business administration to further my career.
I am fluent in three languages - English, Spanish, and French.
My area of interest in Civil Engineering is structural engineering.
I enjoy designing and analyzing structures such as buildings, bridges, and towers.
I am fascinated by the physics and mathematics involved in ensuring the safety and stability of structures.
I have experience using software such as SAP2000 and ETABS to model and analyze structures.
I am also interested in exploring new materials and construction techniques...
I was interviewed before Jan 2016.
I was interviewed in Dec 2016.
I was interviewed in Aug 2016.
I am a recent graduate with a degree in Mechanical Engineering and a passion for problem-solving and innovation.
Recent graduate with a degree in Mechanical Engineering
Passionate about problem-solving and innovation
Experience with CAD software like SolidWorks
Completed internships at engineering firms
L&T is a renowned company known for its excellence in engineering and construction.
L&T has a strong reputation in the industry for delivering high-quality projects.
The company offers excellent opportunities for career growth and development.
L&T has a diverse range of projects across various sectors, providing exposure to different domains.
The company values innovation and encourages employees to think creatively.
L&T ha...
The cost of painting the wall behind me cannot be determined without additional information.
The cost of painting a wall depends on various factors such as the size of the wall, the type of paint used, and the labor charges.
Additional information needed includes the dimensions of the wall, the type of paint desired, and the cost of labor per square foot or hour.
Once these details are provided, an estimate can be calcula...
M25 concrete is a mix of concrete with a compressive strength of 25 MPa.
M25 concrete is commonly used in construction for foundations, columns, and beams.
It is made by mixing cement, sand, and coarse aggregates in a ratio of 1:1:2.
The water-cement ratio should be around 0.45 for M25 concrete.
The compressive strength of M25 concrete is achieved after 28 days of curing.
M25 concrete is suitable for moderate exposure condi
Concrete tests are used to determine the strength and quality of concrete.
Compression test measures the strength of concrete under compression
Slump test measures the consistency and workability of fresh concrete
Air content test measures the amount of air trapped in concrete
Water permeability test measures the ability of concrete to resist water penetration
Rebound hammer test measures the surface hardness of concrete
Water absorption test is a measure of the amount of water absorbed by a material under specified conditions.
The test is used to determine the porosity and permeability of a material.
It involves immersing the material in water for a specified period of time and then measuring the weight gain.
The percentage of weight gain is calculated and used to determine the water absorption rate of the material.
The test is commonly u...
After receiving the plan of a construction, the following steps should be followed.
Review the plan thoroughly to understand the scope and requirements of the project.
Identify any potential issues or conflicts in the plan and communicate them to the relevant stakeholders.
Create a detailed project schedule and timeline based on the plan.
Allocate resources and manpower according to the requirements of the plan.
Obtain nece...
Chain surveying is time-consuming and requires skilled personnel.
Requires a lot of time and effort to set up and measure accurately
Not suitable for large areas or uneven terrain
Errors can accumulate quickly and lead to inaccurate results
Requires skilled personnel to operate and interpret data
Difficult to use in areas with obstacles or obstructions
May not be suitable for certain types of surveys, such as topographical s
My final year project is about designing a smart irrigation system using IoT technology.
Utilizing sensors to monitor soil moisture levels
Automating the irrigation process based on real-time data
Implementing a mobile app for remote monitoring and control
Reducing water wastage and improving crop yield
Example: Using Arduino sensors to measure soil moisture and control water pumps
I completed a project on renewable energy systems in my final year training.
Researched different types of renewable energy sources
Designed and implemented a small-scale renewable energy system
Analyzed the performance and efficiency of the system
Presented findings and recommendations to faculty and peers
Yes, I am willing and able to do site work.
I have experience working on construction sites during my previous internships.
I am physically fit and able to handle the demands of site work.
I understand the importance of safety protocols and will adhere to them at all times.
I am a quick learner and will adapt to any new challenges that arise on site.
I have a strong support system in place to ensure my parents are well taken care of, including family members, caregivers, and financial planning.
My siblings and I have a plan in place to share responsibilities for our parents' care.
We have hired caregivers to assist with daily tasks and provide companionship.
We have set up a financial plan to cover any medical expenses or long-term care needs.
We have regular check-ins...
The duration of L&T Construction Graduate Engineer Trainee (Get) interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 22 interviews
6 Interview rounds
based on 48 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
703
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Construction Manager
504
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
393
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
323
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA