L&T Construction Deputy Project Manager Interview Questions and Answers for Experienced

Updated 2 Aug 2024

L&T Construction Deputy Project Manager Interview Experiences for Experienced

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Preparation basic of pipeline and job procedures.

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I applied via Campus Placement and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Computer aptitude test

Round 2 - HR 

(1 Question)

  • Q1. Tell about yourself and your interests what are your hobbies etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and be thorough in subject gained in graduation

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Regarding all the finishing items. i.e cladding false ceiling ,tiling
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion, about company portfolio

Interview Preparation Tips

Interview preparation tips for other job seekers - Always do what you want , seeking new jobs

I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Please tell me about yourself
  • Ans. I have 15 years experience in Highways Structure activities etc.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Assistant Manager interview:
  • Technical skill
Interview preparation tips for other job seekers - It was good experience in first time I faced lnt Sr. staff

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Deputy Project Manager interview for experienced candidates?
L&T Construction interview process for experienced candidates usually has 1 rounds. The most common rounds in the L&T Construction interview process for experienced candidates are Technical.
What are the top questions asked in L&T Construction Deputy Project Manager interview for experienced candidates?

Some of the top questions asked at the L&T Construction Deputy Project Manager interview for experienced candidates -

  1. Cost to complition of project getting delay .how to make profite to comp...read more
  2. How much ur carpent area and buildup a...read more
  3. Shuttering oil cover...read more

Tell us how to improve this page.

L&T Construction Deputy Project Manager Interview Process for Experienced

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Dilip Buildcon Interview Questions
4.0
 • 146 Interviews
G R Infraprojects Interview Questions
4.1
 • 134 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 66 Interviews
View all
L&T Construction Deputy Project Manager Salary
based on 6 salaries
₹14.5 L/yr - ₹30 L/yr
91% more than the average Deputy Project Manager Salary in India
View more details
Assistant Manager
1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
706 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
491 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
469 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
327 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview