Upload Button Icon Add office photos

L&T Construction

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

L&T Construction Assistant Engineering Manager Interview Questions, Process, and Tips

Updated 3 Nov 2023

Top L&T Construction Assistant Engineering Manager Interview Questions and Answers

L&T Construction Assistant Engineering Manager Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.

Interview Preparation Tips

Topics to prepare for L&T Construction Assistant Engineering Manager interview:
  • Electrical Power System
  • Transformers
  • Motors
  • Switchgear
  • Electrical protection
  • Electrical distribution
Interview preparation tips for other job seekers - Have thorough knowledge of the field you have an experience on. Clear your basics and also go for some depth study.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - See the company job postings in the career portal.

Assistant Engineering Manager Interview Questions Asked at Other Companies

Q1. How to check a lightning arrestor is working fine or not?
Q2. What is the importance of the tertiary winding in a power transfo ... read more
Q3. What are the steps for selection of a cable?
Q4. How the Engineer has started? How the turbine works? How the prop ... read more
Q5. What is the highest capacity of AHU handled

I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Need strong knowledge on technical based on your experience and better communication will helps lot.

Interview questions from similar companies

I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is MPLS and flow of labels in MPLS
  • Ans. 

    MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.

    • MPLS stands for Multiprotocol Label Switching

    • Labels are assigned to packets at the ingress router

    • Labels are used to identify the path a packet should take through the network

    • Labels are swapped at each MPLS router along the path

    • The last MPLS router removes the label and forwards the packet based on the IP ad...

  • Answered by AI
  • Q2. What is route reflector in BGP
  • Ans. 

    Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.

    • Route reflector reduces the number of iBGP peerings required in a network.

    • It helps in scaling the network by reducing the number of updates and processing required.

    • Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.

    • It is commonly used in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for the role or profile for which you are applying. Brushup basics about all the topics for your role

Skills evaluated in this interview

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Machinery maintenance Dpr maintenance,local purchasing,

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice,good and teritical intrew done and completed

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Contribute & help others!
anonymous
You can choose to be anonymous

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Assistant Engineering Manager interview?
L&T Construction interview process usually has 3 rounds. The most common rounds in the L&T Construction interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in L&T Construction Assistant Engineering Manager interview?

Some of the top questions asked at the L&T Construction Assistant Engineering Manager interview -

  1. What is the importance of the tertiary winding in a power transform...read more
  2. How to check a lightning arrestor is working fine or n...read more
  3. What are the steps for selection of a cab...read more

Recently Viewed

REVIEWS

Reliance Industries

No Reviews

REVIEWS

Reliance Industries

No Reviews

SALARIES

Kotak Mahindra Bank

SALARIES

Kotak Mahindra Bank

REVIEWS

L&T Construction

No Reviews

REVIEWS

L&T Construction

No Reviews

JOBS

Dpr Infra Projects

No Jobs

SALARIES

Kotak Mahindra Bank

INTERVIEWS

L&T Technology Services

No Interviews

REVIEWS

Reliance Industries

No Reviews

Tell us how to improve this page.

L&T Construction Assistant Engineering Manager Interview Process

based on 4 interviews

1 Interview rounds

  • Resume Shortlist Round
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 133 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
View all
L&T Construction Assistant Engineering Manager Salary
based on 322 salaries
₹5 L/yr - ₹17 L/yr
At par with the average Assistant Engineering Manager Salary in India
View more details

L&T Construction Assistant Engineering Manager Reviews and Ratings

based on 56 reviews

3.3/5

Rating in categories

3.2

Skill development

2.7

Work-life balance

3.1

Salary

4.0

Job security

2.7

Company culture

2.6

Promotions

2.9

Work satisfaction

Explore 56 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
705 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
503 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
410 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
322 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview