I applied via Recruitment Consulltant and was interviewed in May 2023. There were 2 interview rounds.
Selection of a cable involves considering factors like voltage rating, current carrying capacity, insulation material, and environmental conditions.
Determine the voltage rating required for the application.
Calculate the current carrying capacity needed based on the load.
Select the appropriate size and type of cable based on the current rating.
Consider the insulation material suitable for the environment (e.g. PVC, XLPE...
Load factor is the ratio of the average load to the maximum load that a system can handle.
Load factor is calculated by dividing the average load by the maximum load capacity.
It is used to measure the efficiency of a system or equipment in handling varying loads.
For example, a power plant with a load factor of 0.8 means it is operating at 80% of its maximum capacity.
The tertiary winding in a power transformer is important for providing a path for zero-sequence currents and reducing harmonics.
Provides a path for zero-sequence currents, which helps in balancing the three-phase system
Reduces harmonics in the system, improving power quality
Helps in limiting fault currents and improving the overall efficiency of the transformer
To check if a lightning arrestor is working fine, you can perform visual inspections, check for physical damage, test for continuity, and monitor surge protection levels.
Perform visual inspections for any signs of physical damage or wear
Check for loose connections or corrosion on the lightning arrestor
Test for continuity using a multimeter to ensure proper electrical connection
Monitor surge protection levels to ensure ...
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2021. There were 4 interview rounds.
Top trending discussions
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 14 Feb 2021
posted on 18 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 1 Jun 2021
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 2 May 2021
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
based on 4 interviews
1 Interview rounds
based on 56 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
701
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
488
salaries
| ₹5.4 L/yr - ₹17 L/yr |
Civil Site Engineer
469
salaries
| ₹1.2 L/yr - ₹8.4 L/yr |
Assistant Engineering Manager
328
salaries
| ₹6 L/yr - ₹17 L/yr |
Larsen & Toubro Limited
Dilip Buildcon
Simplex Infrastructures
Power Mech Projects