Technical specifications for concrete activities involve details about the materials, processes, and equipment used.
Technical specifications outline the requirements for each activity
They include details about the materials, processes, and equipment used
They ensure that the project is completed to the required standards
Examples include the strength and composition of the concrete mix, curing time, and equipment used fo...
I have 10 years of project management experience in various industries.
Managed multiple projects simultaneously
Led cross-functional teams to successful project completion
Developed and implemented project plans, schedules, and budgets
Monitored project progress and ensured adherence to timelines and deliverables
Identified and mitigated project risks
Implemented project management best practices
Ensured effective communicat...
I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 23 Oct 2024
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Project flow chart outlines the steps from project initiation to completion and handover.
Initiation: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Execution: Implement the project plan, monitor progress, and manage any issues.
Monitoring and Controlling: Track project performance, make adjustments as needed.
Closing: Finalize all pr...
I rate my knowledge on MEP as advanced.
I have extensive experience managing MEP projects in various industries.
I am familiar with MEP systems and their integration within construction projects.
I have successfully coordinated with MEP subcontractors to ensure project success.
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
A preaction system is a type of fire protection system that combines the features of a dry pipe system and a deluge system.
Preaction systems are commonly used in areas where accidental activation of the sprinkler system could cause water damage, such as data centers or museums.
These systems require two separate events to occur before water is released - detection of a fire and activation of the sprinkler heads.
Preactio...
I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.
The compliances followed for the complex include building codes, safety regulations, and environmental standards.
Building codes ensure that the complex meets structural and safety requirements.
Safety regulations cover fire safety, emergency preparedness, and security measures.
Environmental standards focus on waste management, energy efficiency, and sustainability.
Compliances may also include local zoning laws and regul...
I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.
The amount of fresh air added in the AHU room depends on various factors such as occupancy, ventilation requirements, and air quality standards.
The ASHRAE standard 62.1 provides guidelines for determining the minimum ventilation rates based on the number of occupants and the type of space.
The fresh air intake should be sufficient to dilute indoor pollutants and maintain a healthy indoor environment.
Factors like the pre...
CAM charges are calculated by dividing the total operating expenses of a property by the total square footage of the property.
Determine the total operating expenses of the property
Determine the total square footage of the property
Divide the total operating expenses by the total square footage to get the CAM charge per square foot
Multiply the CAM charge per square foot by the square footage of the tenant's leased space
Covid-19 protocol includes measures to prevent the spread of the virus such as wearing masks, social distancing, and sanitizing frequently touched surfaces.
Wearing masks is mandatory in public places
Maintaining social distancing of at least 6 feet
Frequent hand washing and sanitizing
Regular cleaning and disinfecting of frequently touched surfaces
Isolation and quarantine measures for infected individuals
Remote work and v...
Crisis management is the process of handling and mitigating unexpected events that can harm an organization's reputation or operations.
Identifying potential crises and developing a plan to address them
Communicating effectively with stakeholders during a crisis
Implementing the crisis management plan and taking appropriate actions
Evaluating the effectiveness of the crisis management plan and making improvements
Examples i...
based on 1 interview
Interview experience
based on 21 reviews
Rating in categories
Project Engineer
146
salaries
| ₹2.6 L/yr - ₹7.8 L/yr |
Assistant Project Manager
123
salaries
| ₹5.2 L/yr - ₹12.2 L/yr |
Project Manager
102
salaries
| ₹7 L/yr - ₹18.8 L/yr |
Assistant Facility Manager
95
salaries
| ₹2.9 L/yr - ₹7.2 L/yr |
Senior Project Engineer
83
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
CBRE
M3M India
R.S. Infraprojects
My Home Constructions