Steel and concrete are commonly used construction materials in civil engineering.
Steel is an alloy of iron and carbon, known for its high strength and durability.
Concrete is a composite material made of cement, water, and aggregates, used for its compressive strength and versatility.
Steel is commonly used in structural elements like beams, columns, and reinforcement bars.
Concrete is used for foundations, slabs, walls, ...
Top trending discussions
Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.
Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.
The steam is used to rotate a turbine, which drives a generator to produce electricity.
The process involves several components such as boilers, turbines, condensers, and cooling towers.
Thermal power plants require a constan...
posted on 20 Jul 2024
The size of steel used for columns depends on the load it needs to support and the height of the column.
The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.
The size of steel columns can also be determined based on the structural design calculations and building codes.
Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...
Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.
Development bars length is determined based on structural design requirements.
It is important to follow the specifications provided by the structural engineer.
The length of development bars can vary depending on the type of structure and load requirements.
Proper placement and anchoring of developmen
I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio affects the strength and durability of concrete.
Lower water cement ratio results in stronger concrete but may be difficult to work with.
Typical water cement ratio ranges from 0.4 to 0.6 for normal strength concrete.
Excess water can lead to lower strength and durability of concrete.
I applied via Walk-in
Sample interview questions for Site Engineer position
BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications
Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase
Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement
Full form of TMT ...
posted on 18 Apr 2022
I applied via Company Website
I have 5 years of experience as a Site Engineer.
I have worked on various construction projects, overseeing the site operations and ensuring adherence to plans and specifications.
During my tenure, I have successfully managed teams, coordinated with subcontractors, and resolved on-site issues.
I am well-versed in interpreting blueprints, conducting quality inspections, and ensuring compliance with safety regulations.
One n...
posted on 13 Dec 2022
I applied via Campus Placement and was interviewed in Nov 2022. There were 2 interview rounds.
GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.
GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.
It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.
For example, if the GSB tolerance for compa...
Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.
Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.
Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.
The process may include activities such as regrading, compacting the soil, re...
Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.
Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.
The steam is used to rotate a turbine, which drives a generator to produce electricity.
The process involves several components such as boilers, turbines, condensers, and cooling towers.
Thermal power plants require a constan...
posted on 15 Dec 2024
I was interviewed in Nov 2024.
Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.
Managing project budgets effectively to avoid cost overruns
Dealing with unexpected site conditions such as soil instability or environmental hazards
Ensuring compliance with regulations and obtaining necessary permits
Balancing the needs of various stakeho...
I applied via Naukri.com and was interviewed in Nov 2021. There were 5 interview rounds.
Working in a tunnel involves various tasks such as planning, excavation, ventilation, and safety measures.
Planning and designing the tunnel layout
Excavating the tunnel using appropriate methods and equipment
Ensuring proper ventilation to maintain air quality
Implementing safety measures to prevent accidents
Monitoring and maintaining the tunnel's structural integrity
Coordinating with other professionals involved in the p...
IS Code refers to Indian Standards Code, which are specifications and guidelines for various engineering practices in India.
IS Code stands for Indian Standards Code.
It is a set of specifications and guidelines for various engineering practices in India.
IS Codes cover a wide range of topics such as construction materials, design criteria, testing methods, safety standards, etc.
These codes are developed and maintained by...
Graduate Engineer Trainee (Get)
20
salaries
| ₹2 L/yr - ₹2.6 L/yr |
Junior Engineer
14
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Assistant Manager
11
salaries
| ₹4.4 L/yr - ₹5.5 L/yr |
Site Engineer
11
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Senior Engineer
7
salaries
| ₹4.1 L/yr - ₹7.2 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company