Upload Button Icon Add office photos

Filter interviews by

KMC Constructions Site Engineer Interview Questions and Answers

Updated 18 Jan 2024

KMC Constructions Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 18 Jan 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about previous project
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about steel ,concrete
  • Ans. 

    Steel and concrete are commonly used construction materials in civil engineering.

    • Steel is an alloy of iron and carbon, known for its high strength and durability.

    • Concrete is a composite material made of cement, water, and aggregates, used for its compressive strength and versatility.

    • Steel is commonly used in structural elements like beams, columns, and reinforcement bars.

    • Concrete is used for foundations, slabs, walls, ...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of steel used for columns
  • Ans. 

    The size of steel used for columns depends on the load it needs to support and the height of the column.

    • The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.

    • The size of steel columns can also be determined based on the structural design calculations and building codes.

    • Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...

  • Answered by AI
  • Q2. Development bars length
  • Ans. 

    Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.

    • Development bars length is determined based on structural design requirements.

    • It is important to follow the specifications provided by the structural engineer.

    • The length of development bars can vary depending on the type of structure and load requirements.

    • Proper placement and anchoring of developmen

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Cement ka grade
  • Q2. Cancrete M20 retio
  • Q3. What is tha water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio affects the strength and durability of concrete.

    • Lower water cement ratio results in stronger concrete but may be difficult to work with.

    • Typical water cement ratio ranges from 0.4 to 0.6 for normal strength concrete.

    • Excess water can lead to lower strength and durability of concrete.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's complete my process job
Request company

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of d...
  • Ans. 

    Sample interview questions for Site Engineer position

    • BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications

    • Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase

    • Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement

    • Full form of TMT ...

  • Answered by AI
  • Q2. 1.introduction your self 2.Why you choose civil engineering? 3.whats ur salary expections? 4.Why u leave previous company?

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Civil Engineering
  • Concrete technology
  • Bmc
  • Quantity Surveyor Activities
Interview preparation tips for other job seekers - Prepare properly and crack interview because not hard question. Firstly 50 marks question paper provide and give you 30 minutes and after getting more than 25 then personal interview.

I applied via Company Website

Round 1 - Technical 

(1 Question)

  • Q1. How much year experience
  • Ans. 

    I have 5 years of experience as a Site Engineer.

    • I have worked on various construction projects, overseeing the site operations and ensuring adherence to plans and specifications.

    • During my tenure, I have successfully managed teams, coordinated with subcontractors, and resolved on-site issues.

    • I am well-versed in interpreting blueprints, conducting quality inspections, and ensuring compliance with safety regulations.

    • One n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skills very confident and good knowledge

I applied via Campus Placement and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Whats is a gsb tollrance
  • Ans. 

    GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.

    • GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.

    • It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.

    • For example, if the GSB tolerance for compa...

  • Answered by AI
  • Q2. Please explained the bumping removing process
  • Ans. 

    Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.

    • Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.

    • Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.

    • The process may include activities such as regrading, compacting the soil, re...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice job & company hr barbrik project limited raipur my first attempted sending resume accepted here but I love hr recall back process
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Nov 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. : What are some of the biggest challenges civil engineers face?
  • Ans. 

    Some of the biggest challenges civil engineers face include managing project budgets, dealing with unexpected site conditions, and ensuring compliance with regulations.

    • Managing project budgets effectively to avoid cost overruns

    • Dealing with unexpected site conditions such as soil instability or environmental hazards

    • Ensuring compliance with regulations and obtaining necessary permits

    • Balancing the needs of various stakeho...

  • Answered by AI
  • Q2. What is your favorite role on a project team? How do you react to a task you're not sure how to approach?

I applied via Naukri.com and was interviewed in Nov 2021. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. About yourself and why you join our organisation?
  • Q2. About Tunnel and your specific field
  • Q3. How to working inTunnel
  • Ans. 

    Working in a tunnel involves various tasks such as planning, excavation, ventilation, and safety measures.

    • Planning and designing the tunnel layout

    • Excavating the tunnel using appropriate methods and equipment

    • Ensuring proper ventilation to maintain air quality

    • Implementing safety measures to prevent accidents

    • Monitoring and maintaining the tunnel's structural integrity

    • Coordinating with other professionals involved in the p...

  • Answered by AI
  • Q4. Specifications of IS Code
  • Ans. 

    IS Code refers to Indian Standards Code, which are specifications and guidelines for various engineering practices in India.

    • IS Code stands for Indian Standards Code.

    • It is a set of specifications and guidelines for various engineering practices in India.

    • IS Codes cover a wide range of topics such as construction materials, design criteria, testing methods, safety standards, etc.

    • These codes are developed and maintained by...

  • Answered by AI
  • Q5. SALARY DISCUSSION

KMC Constructions Interview FAQs

How many rounds are there in KMC Constructions Site Engineer interview?
KMC Constructions interview process usually has 2 rounds. The most common rounds in the KMC Constructions interview process are Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 KMC Constructions interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
KMC Constructions Site Engineer Salary
based on 11 salaries
₹1.5 L/yr - ₹4.5 L/yr
10% less than the average Site Engineer Salary in India
View more details
Graduate Engineer Trainee (Get)
20 salaries
unlock blur

₹2 L/yr - ₹2.6 L/yr

Junior Engineer
14 salaries
unlock blur

₹2.2 L/yr - ₹4 L/yr

Assistant Manager
11 salaries
unlock blur

₹4.4 L/yr - ₹5.5 L/yr

Site Engineer
11 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Senior Engineer
7 salaries
unlock blur

₹4.1 L/yr - ₹7.2 L/yr

Explore more salaries
Compare KMC Constructions with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview