user image Anonymous

posted on 21 Jan 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation

Interview questions from similar companies

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

Interview Questionnaire 

1 Question

  • Q1. Site related
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Exam will be conduct for aptitude test

Round 3 - Technical 

(3 Questions)

  • Q1. Any asked questions my Bulding mteriyal i will attemt given answer your questions
  • Q2. Bulding material any questions
  • Q3. Can u any questions my releted tred

Interview Preparation Tips

Topics to prepare for GMR Group Site Engineer interview:
  • Bulding meterial
Interview preparation tips for other job seekers - A standardized test is a test that is administered and scored in a consistent, or "standard", manner

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is slump test Curing of method
  • Ans. 

    Slump test is a measure of the consistency of fresh concrete.

    • It is used to determine the workability of concrete.

    • The test involves filling a standard cone-shaped container with concrete and then removing the cone to see how much the concrete slumps or settles.

    • The amount of slump is measured in millimeters and indicates the wetness or dryness of the concrete.

    • Curing is the process of maintaining moisture in the concrete ...

  • Answered by AI
  • Q2. Cube test Direct Sher Test Plete lod test CBRTest

Interview Preparation Tips

Interview preparation tips for other job seekers - Manjil aur taqdeer khud hi bnani padti hai

I applied via Naukri.com and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 32 dia 1 meter weight how much?

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions and previous company project details must
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. They are asking about my work and previous work please and company including salary and benifits
Round 3 - Technical 

(2 Questions)

  • Q1. Asking about building structure work related questions and about my planing for smooth working on site,with coordination between contractor and company pmc or cleint
  • Q2. About quality quantity and site work

Interview Preparation Tips

Interview preparation tips for other job seekers - All prepared about your relevant sector interview with honesty

Simar Infrastructures Interview FAQs

How many rounds are there in Simar Infrastructures Site Engineer interview?
Simar Infrastructures interview process usually has 1 rounds. The most common rounds in the Simar Infrastructures interview process are Technical.
What are the top questions asked in Simar Infrastructures Site Engineer interview?

Some of the top questions asked at the Simar Infrastructures Site Engineer interview -

  1. Thermal power plant operat...read more
  2. Power plant operation And maintena...read more
  3. Plant operat...read more

Tell us how to improve this page.

Simar Infrastructures Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Simar Infrastructures Site Engineer Salary
based on 9 salaries
₹2.2 L/yr - ₹4 L/yr
10% less than the average Site Engineer Salary in India
View more details

Simar Infrastructures Site Engineer Reviews and Ratings

based on 2 reviews

3.6/5

Rating in categories

4.2

Skill development

3.6

Work-life balance

2.6

Salary

3.6

Job security

3.2

Company culture

3.6

Promotions

3.6

Work satisfaction

Explore 2 Reviews and Ratings
Mechanical Engineer
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Maintenance Engineer
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Incharge
13 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Simar Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview