I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
Aggregate code is used to combine multiple values into a single result.
Aggregate functions are commonly used in SQL queries to perform calculations on sets of data.
Examples of aggregate functions include SUM, AVG, COUNT, MIN, and MAX.
Aggregate code can be used to summarize data and generate reports in a more efficient manner.
Code of sampling refers to the set of rules and procedures followed in selecting samples for testing or analysis.
Code of sampling includes guidelines on sample size, selection method, and frequency of sampling.
It ensures that samples are representative of the population being tested.
Examples of code of sampling include ISO 2859 for sampling procedures in quality control and ASTM D4057 for sampling petroleum and petrole
Top trending discussions
I applied via Approached by Company and was interviewed before Dec 2021. There was 1 interview round.
I applied via Company Website and was interviewed before Jan 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
posted on 27 Jun 2021
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
Answering questions related to QA QC Engineer position
If material is purchased from any factory, I will ensure that it meets the required specifications and standards
I can work for 8-10 hours a day depending on the workload
I am familiar with plant calibration procedures and can perform them
The borrow area will be selected based on factors such as soil type, distance from the construction site, and availability
I manage ...
posted on 27 Oct 2023
I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.
A 6.6 kVA switch gear is a type of electrical equipment used for controlling, protecting, and isolating electrical circuits.
Switch gear is used to control the flow of electricity in a circuit
6.6 kVA indicates the power rating of the switch gear
It is important for protecting electrical equipment from overloads and short circuits
posted on 26 Mar 2023
I applied via Campus Placement
I applied via Campus Placement and was interviewed before May 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
Control wiring for ACB and VCB involves connecting control circuits to the breaker for proper operation.
Control wiring connects the breaker control circuits to the control panel.
The wiring should be properly sized and insulated.
The wiring should be color-coded for easy identification.
The wiring should be tested for proper operation before energizing the breaker.
Examples of control circuits include trip coil, close coil
Control wiring is read by understanding the symbols and connections on the diagram.
Identify the power source and the load
Understand the symbols used for switches, relays, and other components
Follow the connections and determine the control logic
Check for any safety interlocks or emergency stops
Verify the wiring matches the diagram
I applied via Approached by Company and was interviewed before Dec 2021. There was 1 interview round.
Interview experience
based on 2 reviews
Rating in categories
Graduate Engineer Trainee (Get)
20
salaries
| ₹2 L/yr - ₹2.6 L/yr |
Junior Engineer
14
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Assistant Manager
11
salaries
| ₹4.4 L/yr - ₹5.5 L/yr |
Site Engineer
11
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Senior Engineer
7
salaries
| ₹4.1 L/yr - ₹7.2 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company