I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.
Which type of work and how to manage work on data Lake through NHAI One Application
Check and mention work on site dally from NHAI Data Lake
I applied via Referral and was interviewed in Aug 2023. There were 3 interview rounds.
On Performance Appraisals
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
Aggregate code is used to combine multiple values into a single result.
Aggregate functions are commonly used in SQL queries to perform calculations on sets of data.
Examples of aggregate functions include SUM, AVG, COUNT, MIN, and MAX.
Aggregate code can be used to summarize data and generate reports in a more efficient manner.
Code of sampling refers to the set of rules and procedures followed in selecting samples for testing or analysis.
Code of sampling includes guidelines on sample size, selection method, and frequency of sampling.
It ensures that samples are representative of the population being tested.
Examples of code of sampling include ISO 2859 for sampling procedures in quality control and ASTM D4057 for sampling petroleum and petrole
KMC Constructions interview questions for popular designations
I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.
Steel and concrete are commonly used construction materials in civil engineering.
Steel is an alloy of iron and carbon, known for its high strength and durability.
Concrete is a composite material made of cement, water, and aggregates, used for its compressive strength and versatility.
Steel is commonly used in structural elements like beams, columns, and reinforcement bars.
Concrete is used for foundations, slabs, walls, ...
I applied via Walk-in and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
based on 7 interviews
Interview experience
based on 122 reviews
Rating in categories
Graduate Engineer Trainee (Get)
20
salaries
| ₹2 L/yr - ₹2.6 L/yr |
Junior Engineer
14
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Site Engineer
11
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Manager
10
salaries