posted on 6 Jul 2024
To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 23 Sep 2024
I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.
Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.
Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.
DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...
posted on 12 Aug 2024
I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.
posted on 10 Jun 2024
posted on 17 Feb 2020
I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.
posted on 11 Jun 2023
Already talked to you
posted on 8 Sep 2022
Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.
Flexible pavement is made of multiple layers of materials that can flex under traffic loads.
Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.
New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...
The question describes the application of prime coat and tack coat on a WMM surface.
Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.
Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.
The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.
The tack coat helps in providing a strong b...
Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.
Use M15 grade concrete with maximum aggregate cement ratio of 12:1
Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%
Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...
Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.
Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%
Flexure strength of cement concrete after 28 days curing is 4.5 MPA
Compressive strength of cement concrete after 28 days curing is 40 MPA
Dowel bar provided for expansion joint vehicle load transfer between slabs
Tie...
I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.
The amount of miller required for transporting 500 cum concrete depends on various factors.
The type of miller being used
The distance the concrete needs to be transported
The size of the project
The time frame for completing the project
The availability of resources
The budget allocated for the project
based on 1 interview
Interview experience
Assistant Manager
662
salaries
| ₹5.2 L/yr - ₹21.9 L/yr |
Senior Engineer
430
salaries
| ₹4.3 L/yr - ₹13 L/yr |
Civil Engineer
216
salaries
| ₹2.4 L/yr - ₹9.1 L/yr |
Project Engineer
215
salaries
| ₹2.6 L/yr - ₹11 L/yr |
Safety Officer
188
salaries
| ₹1.8 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Sterlite Power
Kalpataru Projects International