Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by KEC International Team. If you also belong to the team, you can get access from here

KEC International Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KEC International Project Officer Interview Questions and Answers

Updated 18 Jan 2025

KEC International Project Officer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Cube strength observe 28 days
  • Q2. Slump value
  • Q3. Slump value 25,75 k/n

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. HydroTest of DI and HDPE pipe
  • Ans. 

    Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.

    • Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.

    • DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Bhai Vegetarian food allowed hai no nonveg food allowed. Aur Daru cigrette nahi pite to company tumhare baap ki samjho .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Self introduction
  • Q2. Experience in the concern field
Round 2 - HR 

(2 Questions)

  • Q1. They will ask about your previous experience
  • Q2. Will ask about previous salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Why do you want to leave your present employer, which is a TATA company?
  • Q2. Why should we recruit you? What value will you add if we select you?
  • Q3. Why you want to change?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Billing Site work
  • Q2. Billing and Site work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(1 Question)

  • Q1. Project Monitoring, scheduling Analyze projects, budget, cash flow, coordination with contractors, Consultant and allied services, construction, resource management, quality control and quality assurance, ...
Round 2 - Group Discussion 

Already talked to you

Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M

I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Structure related pile foundation
  • Q2. Pile testing ,girder stressing
  • Q3. How much miller required for 500 cum concrete transporting
  • Ans. 

    The amount of miller required for transporting 500 cum concrete depends on various factors.

    • The type of miller being used

    • The distance the concrete needs to be transported

    • The size of the project

    • The time frame for completing the project

    • The availability of resources

    • The budget allocated for the project

  • Answered by AI
  • Q4. Girder launching
  • Q5. Box underpasses

Interview Preparation Tips

Interview preparation tips for other job seekers - Give only answer to the point which is no you

KEC International Interview FAQs

How many rounds are there in KEC International Project Officer interview?
KEC International interview process usually has 1 rounds. The most common rounds in the KEC International interview process are One-on-one Round.
What are the top questions asked in KEC International Project Officer interview?

Some of the top questions asked at the KEC International Project Officer interview -

  1. Cube strength observe 28 d...read more
  2. Slump value 25,75 ...read more
  3. Slump va...read more

Tell us how to improve this page.

KEC International Project Officer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 741 Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
Siemens Interview Questions
4.1
 • 416 Interviews
Thermax Limited Interview Questions
4.1
 • 250 Interviews
ABB Interview Questions
4.1
 • 233 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 132 Interviews
View all
KEC International Project Officer Salary
based on 5 salaries
₹3.5 L/yr - ₹9.9 L/yr
55% more than the average Project Officer Salary in India
View more details
Assistant Manager
662 salaries
unlock blur

₹5.2 L/yr - ₹21.9 L/yr

Senior Engineer
430 salaries
unlock blur

₹4.3 L/yr - ₹13 L/yr

Civil Engineer
216 salaries
unlock blur

₹2.4 L/yr - ₹9.1 L/yr

Project Engineer
215 salaries
unlock blur

₹2.6 L/yr - ₹11 L/yr

Safety Officer
188 salaries
unlock blur

₹1.8 L/yr - ₹7.6 L/yr

Explore more salaries
Compare KEC International with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Sterlite Power

4.0
Compare

Kalpataru Projects International

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview