I was interviewed in Aug 2023.
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
I have 5 years of experience in planning, including creating schedules, monitoring progress, and identifying risks.
Developed detailed project schedules using software like Primavera P6
Monitored project progress and updated schedules accordingly
Identified potential risks and developed mitigation plans
Collaborated with project teams to ensure deadlines were met
Implemented changes to schedules as needed to optimize projec
I was interviewed before Sep 2021.
Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify available resources and constraints
Create a detailed project schedule
Monitor progress and make adjustments as necessary
The planning process involves identifying objectives, determining resources, and creating a timeline for completion.
Identify project objectives and goals
Determine available resources and constraints
Create a detailed project plan with timelines and milestones
Monitor progress and make adjustments as necessary
Communicate with stakeholders and team members throughout the process
I was interviewed before Feb 2024.
I applied via Walk-in and was interviewed in Sep 2022. There were 4 interview rounds.
Aptitude questions easy not much difficult but have to write
I applied via LinkedIn and was interviewed in Jul 2021. There were 5 interview rounds.
I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.
Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.
Develop project schedules using software like Primavera P6
Monitor project progress and identify potential delays
Coordinate with various teams to ensure timely completion
Prepare reports on project status and communicate with stakeholders
Implement changes to the schedule as needed to keep the project on
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path helps in identifying the tasks that are crucial for the project timeline.
It determines the shortest possible duration for completing the project.
Any delay in tasks on the critical path will directly impact the project's overall timeline.
Activities on the critical path have ...
Density of steel is approximately 7.85 g/cm^3.
The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).
The density of steel is approximately 7.85 g/cm^3.
Different types of steel may have slightly different densities.
Weight of steel can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel (length x width x height)
Determine the density of the specific type of steel being used
Multiply the volume by the density to get the weight
Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg
Number of tiles can be calculated by determining the area to be covered and the size of each tile.
Calculate the total area to be covered by multiplying the length and width of the space.
Determine the size of each tile in square units.
Divide the total area by the size of each tile to get the number of tiles needed.
Consider adding extra tiles for cuts and wastage.
For example, if a room is 10 feet by 12 feet and each tile
I applied via Campus Placement and was interviewed before Aug 2023. There were 2 interview rounds.
Prepare Aptitude Book, It is good.
Experienced Planning Engineer with a background in civil engineering and a strong track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
Managed the planning and schedulin...
Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.
Critical path determines the shortest possible duration for a project.
It helps in identifying the tasks that are critical and cannot be delayed without delaying the entire project.
Activities on the critical path have zero float or slack.
Any delay in the critical path activities will dela...
S-Curve in Primavera is a graphical representation of project progress over time.
S-Curve shows the planned and actual progress of a project.
It helps in visualizing the project's performance and identifying any deviations from the plan.
The curve is shaped like an 'S' due to the gradual increase in progress at the beginning and end, with a steeper slope in the middle.
The x-axis represents time, and the y-axis represents ...
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Associate Engineer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Godrej Properties
Tata Projects
Shapoorji Pallonji Group