I applied via Referral and was interviewed in Jun 2021. There were 3 interview rounds.
There are three types of levels in scheduling: project level, summary level, and detailed level.
Project level: This is the highest level of scheduling, where the overall project timeline is defined.
Summary level: This level breaks down the project into major phases or milestones.
Detailed level: This level involves breaking down the project into smaller tasks with specific start and end dates.
Drawings are essential for a planning engineer to accurately understand the project scope and create a realistic schedule.
Drawings provide detailed information about the project, including dimensions, specifications, and design elements.
They help in identifying the sequence of activities and dependencies between different tasks.
Drawings assist in estimating the quantity of materials required for each activity.
They aid ...
To evaluate a contractor schedule and ensure project completion as per schedule, I would follow these steps:
Review the contractor's schedule to ensure it is comprehensive and includes all necessary tasks and milestones.
Check for logical sequencing of activities and identify any potential conflicts or constraints.
Assess the duration and resource allocation for each activity to ensure feasibility.
Compare the contractor's...
Top trending discussions
Some of the top questions asked at the Farabi Petrochemicals Company Planning Engineer interview -
based on 1 review
Rating in categories
DCS Panel Operator
10
salaries
| ₹12.1 L/yr - ₹24 L/yr |
Lab Technician
6
salaries
| ₹10 L/yr - ₹26 L/yr |
Process Engineer
5
salaries
| ₹36 L/yr - ₹40 L/yr |
Production Engineer
5
salaries
| ₹24.2 L/yr - ₹27 L/yr |
Panel Operator
5
salaries
| ₹19 L/yr - ₹25 L/yr |
Reliance Industries
Indian Oil Corporation
Bharat Petroleum
Hindustan Petroleum