I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
Joint measurement sheet is prepared to record the measurements of joints in civil construction projects.
Start by identifying the type of joint and its purpose.
Measure the dimensions of the joint, including length, width, and depth.
Record any additional details such as the type of joint material used.
Ensure accurate measurements by using appropriate tools like a tape measure or calipers.
Include sketches or diagrams to i...
BBS (Bar Bending Schedule) is a detailed report that provides information about the reinforcement steel required for a construction project.
BBS is prepared by civil engineers to ensure accurate fabrication and placement of reinforcement bars.
It includes details like bar mark, bar size, length, shape, and number of bars required for each structural element.
BBS helps in estimating the quantity of steel required, reducing...
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
Top trending discussions
posted on 22 Feb 2022
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
based on 20 reviews
Rating in categories
Civil Site Engineer
84
salaries
| ₹1.4 L/yr - ₹4.5 L/yr |
Civil Engineer
59
salaries
| ₹1.8 L/yr - ₹4.4 L/yr |
Safety Officer
44
salaries
| ₹2.3 L/yr - ₹5.6 L/yr |
Site Engineer
26
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Billing Engineer
21
salaries
| ₹2.1 L/yr - ₹5.8 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
Ramky Infrastructure