Filter interviews by
I applied via Walk-in and was interviewed before Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Nov 2020. There was 1 interview round.
posted on 12 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
Quality lab and site test of concrete involves testing the strength, durability, and consistency of concrete samples.
Quality lab tests include compressive strength test, slump test, air content test, and temperature test.
Site tests involve sampling concrete from the construction site, conducting field tests like slump test and air content test, and monitoring curing conditions.
Quality engineers ensure that concrete mee...
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
It was good as well as challenging
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
The market salary for a civil engineer with 12 years of experience varies depending on location, company size, and specific skills.
Market salary can range from $80,000 to $150,000 per year
Factors such as location (urban vs rural), company size, and industry specialization can impact salary
Additional certifications or advanced degrees can also increase salary potential
One question paper of 10 questions.
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2022. There were 4 interview rounds.
First part approval line startup is a critical step in ensuring quality control.
Ensure all equipment is calibrated and functioning properly
Verify all materials meet specifications
Perform initial inspections on first parts produced
Document all findings and make necessary adjustments
Obtain approval from appropriate personnel before continuing production
Defect problem can be solved by identifying and addressing the root cause in the input stage.
Identify the source of the defect in the input stage
Implement corrective actions to address the root cause
Monitor and verify the effectiveness of the corrective actions
Continuously improve the input stage to prevent future defects
Defect assembly problem refers to issues in the manufacturing process that result in faulty products.
Defect assembly problems can occur due to issues with machinery, human error, or faulty materials.
Examples of defect assembly problems include misaligned parts, missing components, and incorrect wiring.
To prevent defect assembly problems, quality control measures should be put in place, such as regular inspections and t...
Quality Engineer input problem solved assembly line problem solving and decision making process
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
2 c++ coding questions will be asked based on the STL and array operations
I was interviewed in Jan 2025.
Question related to qc
Increase productivity
5s
Capa
Customer complaint
Others
based on 6 reviews
Rating in categories
Civil Site Engineer
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Surveyor
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Reliance Industries
Tata Group
Aditya Birla Group
Mahindra & Mahindra