Kalpataru Projects International Deputy General Manager Project Interview Questions and Answers

Updated 5 Dec 2021

Kalpataru Projects International Deputy General Manager Project Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is your achievement in past employer
  • Ans. 

    Successfully completed a major infrastructure project ahead of schedule and under budget.

    • Led a team of 50 engineers and technicians to complete a construction project worth $100 million.

    • Implemented efficient project management strategies resulting in a 20% reduction in project timeline.

    • Managed project budget effectively, saving $5 million through cost optimization.

    • Received recognition from the employer for outstanding ...

  • Answered by AI
  • Q2. Why you searching jobs after 18 years
  • Ans. 

    I am searching for new job opportunities after 18 years to further enhance my skills and contribute to a new organization.

    • Seeking new challenges and growth opportunities

    • Want to broaden my professional network

    • Looking for a fresh environment to apply my expertise

    • Desire to make a greater impact in a different organization

    • Exploring new industries or sectors

    • Seeking better work-life balance or location

    • Adapting to changes in

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was merely a technical one about my past achievements and interviewer want to check my knowledge

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Career Aspirations
  • Q2. Longevity expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - As an experienced candidate, give an air of confidence and give assurance as to the longevity of your stay with prospective company.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. For Education and Project details Questions
Round 3 - Technical 

(1 Question)

  • Q1. Project Related Questions Asking
Round 4 - HR 

(1 Question)

  • Q1. Location and Salary Discussion Questions

I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. I had been interviewed for Project engineer role. The interview was conducted by Two portfolio managers. It was around 1 hour & they had asked related to project management & engineering services.
  • Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?
  • Ans. 

    FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.

    • FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.

    • Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.

    • SIL (Safety Integrity Level) is a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Worley Deputy Project Manager interview:
  • Engineering
Interview preparation tips for other job seekers - Interview somehow is not so hard. Asked basic things related to engineering management. Salary negotiation is important. They offer low salaries.

Skills evaluated in this interview

Round 1 - Technical 

(3 Questions)

  • Q1. About construction and technical aspects.
  • Q2. About Family, previous company job profiles
  • Q3. Joining time, salary, family
Round 2 - HR 

(2 Questions)

  • Q1. Job and working atmosphere, Team handling etc
  • Q2. Salary part, family relocation etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Attend positively and honestly and you will be abld to clear

Interview Questionnaire 

4 Questions

  • Q1. What's is the processing of concrete?
  • Ans. 

    Processing of concrete involves mixing cement, water, and aggregates to create a strong and durable material.

    • Mixing cement, water, and aggregates in specific proportions

    • Pouring the mixture into molds or forms

    • Allowing the concrete to cure and harden over time

    • Finishing the surface of the concrete with tools or coatings

    • Testing the strength and durability of the finished product

  • Answered by AI
  • Q2. 1.Batching ,Mixing , Transport, compaction and curing
  • Q3. Concrete maximum tensile strength
  • Ans. 

    The maximum tensile strength of concrete varies depending on the type and mix of concrete.

    • The maximum tensile strength of concrete is typically around 10% of its compressive strength.

    • Reinforcing concrete with steel bars can increase its tensile strength.

    • The maximum tensile strength of normal concrete is around 0.1-0.2% of its compressive strength.

    • High-strength concrete can have a maximum tensile strength of up to 10-15

  • Answered by AI
  • Q4. Characteristics of concrete+1.65times and standard deviations
  • Ans. 

    Concrete+1.65 times standard deviation refers to the strength of concrete at a certain level of confidence.

    • Concrete strength is measured in psi or MPa

    • Standard deviation is a measure of the variability of the strength test results

    • The higher the standard deviation, the more variable the test results

    • The 1.65 factor is used to determine the minimum strength required for a certain level of confidence

    • For example, a concrete ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2022. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Type of Experience with Company Target Achievement on Timely Basis to Complete assignments
  • Q2. Achived Great Target
  • Ans. 

    Yes, I have achieved great targets in my previous roles.

    • In my previous role as Sales Manager, I exceeded the sales target by 20% in the first quarter.

    • I implemented a new marketing strategy that resulted in a 30% increase in customer acquisition.

    • I led a team that successfully launched a new product line, which generated $1 million in revenue within the first month.

  • Answered by AI
  • Q3. Commercial & Costing with Productivity Working
  • Q4. Final Salary Negotiations
  • Q5. Billing & Cost Working for Organization
  • Ans. 

    Billing and cost working is crucial for any organization to maintain financial stability.

    • Billing and cost working involves tracking expenses and revenue to ensure financial stability.

    • It includes creating invoices, managing accounts payable and receivable, and budgeting.

    • Effective billing and cost working can help identify areas for cost savings and improve profitability.

    • For example, implementing a new billing system tha...

  • Answered by AI
  • Q6. Proffit & loss ,MIS Preparation etc
  • Q7. Job Posting Period for further

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to Create Safe Working with Team Building for Project with Organization

Interview Questionnaire 

1 Question

  • Q1. DCE

I applied via Referral and was interviewed before Mar 2017. There were 2 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Experience in underground metro rail station box construction & overall civil experience.

General Tips: Technical questions regarding secant piling, anchoring, rock blasting, soil excavation process, & mainly sequence of construction and managerial skills.
My advice to job seekers is, it is always better to have a good practical experience which will really help to a great extent during interviews.
Skills: Communication, Problem Solving, Leadership, Presentation Skills, Time Management
Duration: 1-4 weeks

Tell us how to improve this page.

Kalpataru Projects International Deputy General Manager Project Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 731 Interviews
Siemens Interview Questions
4.1
 • 429 Interviews
Tata Projects Interview Questions
4.2
 • 420 Interviews
KEC International Interview Questions
4.1
 • 294 Interviews
Tata Technologies Interview Questions
3.6
 • 255 Interviews
ABB Interview Questions
4.1
 • 229 Interviews
View all
36% more than the average Deputy General Manager Project Salary in India
View more details

Kalpataru Projects International Deputy General Manager Project Reviews and Ratings

based on 2 reviews

4.4/5

Rating in categories

4.4

Skill development

4.4

Work-life balance

4.4

Salary

4.4

Job security

5.0

Company culture

3.8

Promotions

3.8

Work satisfaction

Explore 2 Reviews and Ratings
Deputy Manager
574 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Senior Engineer
554 salaries
unlock blur

₹3.4 L/yr - ₹10.6 L/yr

Assistant Manager
544 salaries
unlock blur

₹3.8 L/yr - ₹14.6 L/yr

Civil Engineer
252 salaries
unlock blur

₹2 L/yr - ₹7.5 L/yr

Manager
243 salaries
unlock blur

₹6.2 L/yr - ₹24 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Sterlite Power

4.0
Compare

Adani Transmission

3.7
Compare

Power Grid Corporation of India

4.4
Compare

Tata Power

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview