Upload Button Icon Add office photos

Filter interviews by

Hajee A P Bava Construction General Manager Interview Questions and Answers

Updated 28 Jun 2024

Hajee A P Bava Construction General Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Career Aspirations
  • Q2. Longevity expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - As an experienced candidate, give an air of confidence and give assurance as to the longevity of your stay with prospective company.

Interview questions from similar companies

I applied via Company Website and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Apart from technical, Why you want to Join TATA?
  • Q2. Knowledge about the System , you have applied for. If it is metro- your subject knowledge matters
  • Q3. About your past history- that is obvious
  • Q4. About your achievements and your failures. So please make list beforehand

Interview Preparation Tips

Interview preparation tips for other job seekers - Check the CTC sheet carefully. Variables are misleading.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Background and reason for change
Round 3 - Technical 

(1 Question)

  • Q1. Financial details
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your current profile
  • Ans. 

    I am currently working as a Senior Operations Manager at a multinational company.

    • Responsible for overseeing daily operations and ensuring efficiency

    • Leading a team of managers and supervisors

    • Implementing strategies to improve productivity and reduce costs

    • Collaborating with other departments to achieve company goals

  • Answered by AI
  • Q2. What is your expectations
  • Ans. 

    I expect to lead a team to success by setting clear goals, providing support, and fostering a positive work environment.

    • Setting clear goals and expectations for the team

    • Providing support and resources to help team members succeed

    • Fostering a positive work environment through open communication and collaboration

    • Ensuring efficient operations and achieving business objectives

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Discuss about only profile

I applied via Approached by company and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Safety management, best practices
  • Q2. Achievements during wprking in previous organisation
Round 3 - Group Discussion 

Safety Digitization, Safety Leadrship

Round 4 - HR 

(1 Question)

  • Q1. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Honest, Confident, Polite and Humble
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Based on experience
  • Q2. How could you achieve your coal
  • Q3. How will you face your problem
  • Q4. In time completion of project
  • Q5. Economical and quality work

I applied via Newspaper Ad and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Who is our customer ? You have applied for this post. Are you sure that you are deserve for this post . Explain... What is inventory control? How it works ? What is perpetual inventory control ? What are...
Round 2 - Technical 

(1 Question)

  • Q1. How you will measure a full truck load of sand ? Explain What is cft ? Do you knpw the safety rule for job site ? Explain the disposal method of steel scrap materials. What is reconciliation ? What is the...
  • Ans. 

    To measure a full truck load of sand, calculate the volume in cubic feet (cft) by multiplying the length, width, and height of the truck bed.

    • Measure the length, width, and height of the truck bed

    • Multiply the three measurements to get the volume in cubic feet (cft)

    • For example, if the truck bed is 10 feet long, 5 feet wide, and 3 feet high, the volume would be 150 cubic feet (10 x 5 x 3)

    • Ensure the truck is loaded evenly

  • Answered by AI
Round 3 - Case Study 

Pls tell me one of your achievements in your last employer ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Tha above questionare are enough for the candidates those are
selected for an interview.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Question of inventory and scrap analysis,stock reconciliation
  • Ans. Type of consumable,asset, bulk item, scaffolding,doka item ,minimum and maximum stock, information of ho for scrap sales
  • Answered Anonymously
  • Q2. Rate analysis,costing ,cs, controlling of consumption
  • Ans. Each material self checking and prepare of inspection report
  • Answered Anonymously
  • Q3. Material quality survey of raw material, physical verification,coding,surplus item list generated in sap or cema

Interview Preparation Tips

Topics to prepare for L&T Construction Store Manager interview:
  • Company website
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. How to improve sales
  • Ans. 

    To improve sales, focus on understanding customer needs, training sales team, utilizing data analytics, and implementing effective marketing strategies.

    • Understand customer needs and tailor products/services accordingly

    • Train sales team on effective selling techniques and product knowledge

    • Utilize data analytics to identify trends and target potential customers

    • Implement effective marketing strategies to reach and engage w

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. How to handle team members

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your best
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in May 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Do you have store requirements
  • Ans. 

    Yes, I have store requirements to ensure smooth operations and customer satisfaction.

    • Yes, I have specific requirements for store layout and organization.

    • I require a certain level of inventory management to meet customer demand.

    • I have standards for customer service and employee training.

    • I may have specific technology or equipment requirements for the store.

    • Examples: specific shelving units, POS system, security cameras.

  • Answered by AI
  • Q2. I am sap software use 5 years
  • Q3. Material managment stock in out control inventory managment Loading to unloading maintain
  • Ans. 

    Effective material management is crucial for controlling stock in and out, maintaining inventory, and ensuring smooth loading and unloading processes.

    • Implementing a robust inventory management system to track stock levels and monitor movement

    • Regularly conducting stock audits to identify discrepancies and prevent stockouts or overstocking

    • Establishing efficient loading and unloading procedures to minimize delays and opti...

  • Answered by AI
  • Q4. Do you need store manager contact me

Hajee A P Bava Construction Interview FAQs

How many rounds are there in Hajee A P Bava Construction General Manager interview?
Hajee A P Bava Construction interview process usually has 1 rounds. The most common rounds in the Hajee A P Bava Construction interview process are One-on-one Round.

Tell us how to improve this page.

Hajee A P Bava Construction General Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Mechanical Engineer
74 salaries
unlock blur

₹1.8 L/yr - ₹5.2 L/yr

Safety Officer
51 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

Accountant
30 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Site Engineer
21 salaries
unlock blur

₹1.8 L/yr - ₹4.6 L/yr

Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Hajee A P Bava Construction with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview