Filter interviews by
I am a highly motivated and experienced EHS professional with a passion for ensuring workplace safety and compliance.
I have a Bachelor's degree in Environmental Science and over 5 years of experience in EHS management.
I have a strong understanding of OSHA regulations and have successfully implemented safety programs in previous roles.
I am skilled in conducting risk assessments, developing safety policies and procedures...
I opted for this field because of my passion for ensuring the safety and well-being of people and the environment.
Passion for safety and well-being of people and environment
Interest in implementing and enforcing safety regulations
Desire to prevent accidents and injuries
Enjoy working with people and promoting safety culture
Opportunity to make a positive impact on society
Example: Volunteered for disaster relief efforts
Ex...
Top trending discussions
posted on 27 Jan 2024
I applied via Job Portal and was interviewed before Jan 2023. There was 1 interview round.
Implementing safety procedures at high rise building projects involves thorough planning, training, and enforcement.
Conduct a thorough risk assessment of the high rise building project to identify potential hazards.
Develop and implement a comprehensive safety plan that includes protocols for working at heights, emergency response procedures, and regular safety inspections.
Provide extensive training to all workers on sa...
Safety measures in construction include proper training, use of personal protective equipment, fall protection, and regular inspections.
Provide proper training to all workers on safety procedures and protocols
Ensure all workers wear appropriate personal protective equipment (PPE) such as hard hats, gloves, and safety glasses
Implement fall protection measures such as guardrails, safety nets, or personal fall arrest syst...
Precautions for working at heights include proper training, use of fall protection equipment, regular inspection of equipment, and securing tools and materials.
Ensure all workers are properly trained on working at heights and using fall protection equipment
Regularly inspect fall protection equipment for any signs of wear or damage
Secure all tools and materials to prevent them from falling
Use guardrails, safety nets, or...
Precautions to be taken while lifting materials to prevent injuries and accidents.
Use proper lifting techniques such as bending at the knees and keeping the back straight
Avoid lifting heavy objects alone, ask for help if needed
Wear appropriate personal protective equipment like gloves and closed-toe shoes
Ensure the path is clear of obstacles and plan the lift before executing it
Take breaks in between lifting to avoid s
posted on 7 Mar 2024
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I am well-versed with EHS legal compliance related acts and rules.
I have extensive knowledge of OSHA regulations and guidelines.
I am familiar with EPA regulations related to hazardous waste management.
I have experience in implementing and maintaining compliance programs.
I regularly attend training sessions and seminars to stay up-to-date with the latest regulations.
I have successfully managed compliance audits and
posted on 9 Nov 2024
I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.
RCC road construction involves using reinforced concrete for durability and strength.
RCC stands for Reinforced Cement Concrete
Specifications include using high-quality cement, aggregates, and steel reinforcement
Proper compaction and curing are essential for durability
Thickness of the RCC road depends on traffic load and subgrade conditions
Joint spacing should be as per design specifications
Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.
Excavation: Digging the foundation and preparing the site
Foundation work: Pouring concrete and setting the foundation
Framing: Building the structure's skeleton with wood or steel beams
Roofing: Installing the roof materials
Electrical work: Wiring the building for electricity
Plumbing: Installin...
posted on 20 Nov 2024
I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.
posted on 17 Oct 2024
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
The work nature after agreeing to work involves designing, testing, and implementing electrical systems, troubleshooting issues, and collaborating with team members.
Designing electrical systems based on project requirements
Testing electrical components and systems to ensure functionality
Implementing electrical systems in accordance with safety standards
Troubleshooting electrical issues and providing solutions
Collaborat
posted on 28 Dec 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
ATS stands for Automatic Transfer Switch. It is used to transfer power supply between two sources. Transformer and motor maintenance procedures and protection methods are essential for their efficient operation. SAP is a software used for enterprise resource planning.
ATS is used to automatically switch power supply between two sources, ensuring uninterrupted power supply.
Transformer maintenance involves regular inspect...
HT motor rating is the maximum power it can handle and FLC is the current it draws at full load.
HT motor rating is expressed in kilowatts (kW) or megawatts (MW).
FLC of HT motor is the full load current it draws at rated voltage and frequency.
FLC is expressed in amperes (A) and varies depending on the motor's power rating and efficiency.
For example, a 1 MW HT motor may have a FLC of 1000 A at 11 kV.
The rating and FLC of...
Plant EHT system and single line diagram of plants.
EHT system refers to Extra High Tension system used in power plants
Single line diagram shows the electrical connections between different components
It is important to have a clear and accurate diagram for safety and maintenance purposes
posted on 11 Feb 2024
I was interviewed before Feb 2023.
The major parts in a power transformer include the core, windings, insulation, cooling system, and tap changer.
Core: Provides a path for magnetic flux and is usually made of laminated steel sheets.
Windings: Consist of primary and secondary coils that transfer electrical energy.
Insulation: Prevents electrical leakage and ensures safety.
Cooling System: Keeps the transformer within operating temperature limits, commonly u...
I want to switch electrical circuits and devices.
Switching electrical circuits to control the flow of electricity.
Switching electrical devices on or off.
Switching between different power sources.
Switching between different modes or settings of electrical equipment.
Switching between different electrical connections or configurations.
I applied via Company Website and was interviewed in May 2022. There were 3 interview rounds.
An Air Handling Unit (AHU) consists of several parts that work together to condition and circulate air.
Filter section: Removes dust and particles from the air.
Heating coil: Warms the air before it is distributed.
Cooling coil: Cools the air before it is distributed.
Humidifier: Adds moisture to the air if needed.
Fan: Circulates the air through the AHU.
Dampers: Control the flow of air.
Mixing chamber: Mixes outside and ret...
ACPH stands for Air Changes Per Hour.
ACPH is a measurement used to determine the rate at which the air in a space is replaced with fresh air.
It is commonly used in HVAC systems to ensure proper ventilation and air quality.
ACPH is calculated by dividing the volume of air in a space by the flow rate of fresh air into that space.
For example, if a room has a volume of 1000 cubic feet and fresh air is supplied at a rate of ...
The recommended ACPH for a kitchen depends on the size and type of kitchen.
The recommended ACPH for a commercial kitchen is 15-20 ACPH (air changes per hour).
The size and type of kitchen, as well as the type of cooking equipment used, can affect the recommended ACPH.
The ACPH can be calculated by dividing the volume of the kitchen by the airflow rate.
Proper ventilation and exhaust systems should be in place to maintain ...
VAV stands for Variable Air Volume.
VAV is a type of HVAC system that varies the airflow to different zones based on their heating and cooling needs.
It uses dampers to control the amount of air flowing into each zone.
VAV systems are energy-efficient and can save money on heating and cooling costs.
They are commonly used in commercial buildings and large residential buildings.
VAV systems can be controlled by a building au
VAV stands for Variable Air Volume. It is an HVAC system that controls the airflow to different zones based on their heating and cooling needs.
VAV uses a series of dampers to regulate the amount of air flowing into a space.
It measures the temperature of the air in each zone and adjusts the airflow accordingly.
VAV systems are energy-efficient as they only supply the amount of air required to maintain the desired tempera...
The thumb rule to calculate water consumption in a cooling tower is 3 GPM per every 100 tons of cooling.
Water consumption in cooling tower is calculated based on the cooling load
The thumb rule is 3 GPM per every 100 tons of cooling
Factors like temperature, humidity, and air flow rate affect water consumption
Water treatment and maintenance can also impact water consumption
Parameters considered while calculating heat load in a room
Size of the room
Number of occupants
Type and number of electrical appliances
Number and size of windows
Insulation of walls and ceiling
Orientation of the room
Climate of the region
Directions affect the amount of heat transferred and the efficiency of the system.
Heat transfer is affected by the direction of the flow of fluids or gases.
The orientation of the surface being heated or cooled affects the amount of heat transferred.
The direction of the sun's rays can affect the heat load on a building.
The direction of wind flow affects the heat load on a building.
Considering directions helps in designi
based on 6 reviews
Rating in categories
Assistant Manager
550
salaries
| ₹4.6 L/yr - ₹14 L/yr |
Deputy Manager
547
salaries
| ₹5.8 L/yr - ₹19.4 L/yr |
Senior Engineer
381
salaries
| ₹3.5 L/yr - ₹10.6 L/yr |
Manager
277
salaries
| ₹6.2 L/yr - ₹26 L/yr |
Senior Manager
214
salaries
| ₹10.1 L/yr - ₹34 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power