i
JSW Severfield Structures
Filter interviews by
I applied via Job Portal and was interviewed before Jun 2023. There was 1 interview round.
Types of connections include physical, emotional, social, and professional connections.
Physical connection involves touch and proximity, such as holding hands or hugging.
Emotional connection involves sharing feelings and empathy, such as listening and supporting each other.
Social connection involves interactions with others in a community or group setting, such as friendships and relationships.
Professional connection i...
Wind load refers to the force exerted by wind on structures or objects.
Wind load is influenced by factors such as wind speed, direction, and the shape and size of the object or structure.
It is important to consider wind load when designing buildings, bridges, towers, and other structures to ensure they can withstand the forces exerted by wind.
Wind load calculations are typically based on codes and standards set by orga...
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.
Conduct a gap analysis to identify areas of improvement
Create a plan to implement ISO systems
Provide training to site engineers on ISO standards and quality improvements
Establish a system for monitoring and measuring quality performance
Encourage continuous improvement through regular audits and reviews
I applied via Company Website and was interviewed before Aug 2020. There were 3 interview rounds.
Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
based on 1 interview
Interview experience
Senior Engineer
27
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Assistant Manager
23
salaries
| ₹5.6 L/yr - ₹15 L/yr |
Engineer
11
salaries
| ₹2.5 L/yr - ₹4.5 L/yr |
Structural Engineer
10
salaries
| ₹5.2 L/yr - ₹7.5 L/yr |
Production Engineer
10
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions