Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JSW Severfield Structures Team. If you also belong to the team, you can get access from here

JSW Severfield Structures Verified Tick

Compare button icon Compare button icon Compare
3.8

based on 158 Reviews

Filter interviews by

JSW Severfield Structures Assistant Manager Interview Questions and Answers

Updated 21 Jun 2024

JSW Severfield Structures Assistant Manager Interview Experiences

3 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Self introduction
  • Q2. Drawing related,cranes,machinery &tools etc.
Round 2 - HR 

(1 Question)

  • Q1. Just negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't worry..
Just attend with confidence.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Why your leaving your previous company
Round 3 - Technical 

(2 Questions)

  • Q1. About estimation on steel structures
  • Q2. Cranes, bolts, design estimation

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Standards for calculation
  • Ans. 

    Standards for calculation refer to the guidelines and criteria used to ensure accurate and consistent calculations.

    • Standards for calculation may include specific formulas or algorithms to be used

    • They may also involve guidelines for rounding numbers or handling decimals

    • Examples of standards for calculation include financial accounting principles for calculating profits and losses

    • Another example is the use of standardize...

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Rate analysis for building Items
  • Ans. 

    Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.

    • Rate analysis helps in determining the cost of each building item based on material and labor costs.

    • It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.

    • Rate analysis helps in estimating the total project cost accurately.

    • For ex...

  • Answered by AI
  • Q2. Material Rates of building materials
  • Ans. 

    Material rates of building materials vary based on factors like location, quality, and demand.

    • Material rates can vary based on the location of the construction site.

    • The quality of the building materials can also impact the rates.

    • Demand for certain materials can cause fluctuations in prices.

    • For example, the rate of cement in urban areas may be higher compared to rural areas.

    • Higher quality bricks may cost more than lower...

  • Answered by AI

I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Company's business activities and industry standards
  • Ans. 

    The company is involved in [insert industry] and adheres to industry standards to ensure success and growth.

    • The company operates in [insert industry] and offers [insert products/services].

    • Industry standards are followed to ensure quality and safety in all aspects of the business.

    • Regular market research is conducted to stay up-to-date with industry trends and changes.

    • The company strives for continuous improvement and in...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good, includes personality,technical rounds and lasted for 45 mins
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Eave height, technical questions
Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion and negotiation
  • Q2. Joining date and bond

Interview Preparation Tips

Interview preparation tips for other job seekers - Good working environment

I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is my strength?
  • Ans. 

    My strength is my ability to lead and motivate a team towards achieving goals.

    • Effective communication skills

    • Strong decision-making abilities

    • Ability to delegate tasks efficiently

    • Positive attitude towards challenges

    • Experience in managing teams

    • Motivational skills

    • Goal-oriented mindset

  • Answered by AI
  • Q2. What is my weakness?

Interview Preparation Tips

Topics to prepare for Ramky Infrastructure Assistant Manager interview:
  • Technicals
Interview preparation tips for other job seekers - Give interview confidently and they do a much of bargaining in salary. So stay in your demand.

Interview Questionnaire 

4 Questions

  • Q1. What will you do when material is not received in time at site ?
  • Ans. 

    I will assess the situation and take necessary actions to minimize the impact on the project timeline.

    • Check with the supplier for the reason of delay and expected delivery date

    • Evaluate the impact on the project timeline and inform the project team

    • Explore alternative options such as sourcing from a different supplier or adjusting the project schedule

    • Communicate the revised plan to all stakeholders and ensure timely deli...

  • Answered by AI
  • Q2. How do you manage the team ?
  • Ans. Should maintain proper communication between team members. Good planning assists allocation of work responsibilities to team members, also it avoids irrational approach and duplication of works. As a best team player can complete the project within a specified time and budget.
  • Answered Anonymously
  • Q3. How do you calculate the cement and sand for 1 sqm cm 1:4?
  • Ans. 

    To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.

    • The ratio of cement to sand is 1:4

    • Calculate the total volume of the mixture, which is 1 sqm cm

    • Divide the total volume by the sum of the ratio (1+4=5)

    • Multiply the quotient by the individual ratio to get the volume of cement and sand

    • Convert the volume to weight using the de

  • Answered by AI
  • Q4. What is price escalation?
  • Ans. 

    Price escalation refers to the increase in the price of goods or services over time.

    • It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.

    • Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.

    • For example, the price of gasoline may escalate due to an increase in the cost of c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions are majorly from technical side as per your experience and civil Engineering subjects. Some of the questions related to IS Codes.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Nothing just basic information and then they are conducting technical round based on your profile or department

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience
Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your experience
  • Ans. 

    I have 5 years of experience in management roles, including 2 years as an Assistant Manager.

    • 5 years of management experience

    • 2 years as an Assistant Manager

    • Successfully led a team of 10 employees

    • Implemented new strategies to improve productivity and efficiency

    • Trained and mentored new employees

  • Answered by AI
  • Q2. What is the thickness of subgrade
  • Ans. 

    The thickness of subgrade varies depending on the type of construction and soil conditions.

    • The thickness of subgrade is determined based on the load-bearing capacity required for the structure.

    • It is typically measured in inches or centimeters.

    • For example, in road construction, the subgrade thickness can range from 6 to 12 inches.

    • In building construction, it may vary from a few inches to several feet depending on the bu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Hhhhhhhhhhhhhhhhhhhhhhhhhhhhhhhh

JSW Severfield Structures Interview FAQs

How many rounds are there in JSW Severfield Structures Assistant Manager interview?
JSW Severfield Structures interview process usually has 2 rounds. The most common rounds in the JSW Severfield Structures interview process are Technical, Resume Shortlist and One-on-one Round.
What are the top questions asked in JSW Severfield Structures Assistant Manager interview?

Some of the top questions asked at the JSW Severfield Structures Assistant Manager interview -

  1. Standards for calculat...read more
  2. Drawing related,cranes,machinery &tools e...read more
  3. Cranes, bolts, design estimat...read more

Tell us how to improve this page.

JSW Severfield Structures Assistant Manager Interview Process

based on 5 interviews

Interview experience

4.6
  
Excellent
View more
JSW Severfield Structures Assistant Manager Salary
based on 22 salaries
₹5.5 L/yr - ₹14 L/yr
15% more than the average Assistant Manager Salary in India
View more details

JSW Severfield Structures Assistant Manager Reviews and Ratings

based on 9 reviews

3.5/5

Rating in categories

3.3

Skill development

2.8

Work-life balance

3.7

Salary

3.1

Job security

3.3

Company culture

3.3

Promotions

3.1

Work satisfaction

Explore 9 Reviews and Ratings
Senior Engineer
27 salaries
unlock blur

₹3.5 L/yr - ₹9 L/yr

Assistant Manager
22 salaries
unlock blur

₹5.6 L/yr - ₹14 L/yr

Engineer
11 salaries
unlock blur

₹2.5 L/yr - ₹4.5 L/yr

Structural Engineer
10 salaries
unlock blur

₹5.2 L/yr - ₹7.5 L/yr

Production Engineer
10 salaries
unlock blur

₹3.3 L/yr - ₹5 L/yr

Explore more salaries
Compare JSW Severfield Structures with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Simplex Infrastructures

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview