The different stages in fabrication process include design, cutting, bending, welding, assembly, and finishing.
Design: Planning and creating a blueprint for the product.
Cutting: Using tools like saws or lasers to cut the material into the desired shape.
Bending: Using machines to bend the material into the required angles.
Welding: Joining the different pieces together using heat or pressure.
Assembly: Putting together al...
Top trending discussions
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.
A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.
They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.
Chillers can be water-cooled or air-cooled, depending on the app
Salary and job responsibilities
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
27
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Assistant Manager
23
salaries
| ₹5.6 L/yr - ₹15 L/yr |
Engineer
11
salaries
| ₹2.5 L/yr - ₹4.5 L/yr |
Structural Engineer
10
salaries
| ₹5.2 L/yr - ₹7.5 L/yr |
Production Engineer
10
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Ramky Infrastructure
L & W Constructions