JSW Energy
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed in Jul 2022. There were 3 interview rounds.
TG rolling procedure and bed material specification are important for Operations Engineer.
TG rolling procedure refers to the process of rolling the turbine generator to ensure smooth operation.
Bed material specification refers to the type and quality of material used in the fluidized bed boiler.
Both are crucial for efficient and safe operation of power plants.
TG rolling procedure involves checking alignment, clearance,...
I appeared for an interview in Jan 2025.
There are 2 rounds of aptitude, questions are a bit difficult so prepare well!
Oil is used in transformers for insulation and cooling purposes.
Oil provides insulation to prevent electrical breakdown
Oil helps in dissipating heat generated during operation
Mineral oil is commonly used in transformers for its dielectric properties
Transformer oil also helps in protecting the transformer from moisture and oxidation
Electrical motors run on the principle of electromagnetic induction.
Electrical motors convert electrical energy into mechanical energy through electromagnetic induction
They work based on Faraday's law of electromagnetic induction
Examples include AC motors, DC motors, and brushless motors
Yes, I am open to being relocated for the right opportunity.
I am open to exploring new locations for career growth
I am willing to adapt to new environments and cultures
I have previous experience of relocating for work, such as when I moved cities for my internship
AC motors have a rotor and stator that are visibly different, while DC motors have a commutator and brushes.
Look for a rotor and stator in an AC motor, which are visibly different in size and shape.
Check for a commutator and brushes in a DC motor, which are not present in AC motors.
AC motors typically have a simpler design compared to DC motors, which have more components like brushes and a commutator.
I appeared for an interview in Oct 2024, where I was asked the following questions.
As a Civil Engineer, my responsibilities include designing, planning, and overseeing construction projects to ensure safety and compliance.
Design infrastructure projects like bridges and roads, ensuring they meet safety standards.
Conduct site inspections to monitor progress and compliance with regulations.
Collaborate with architects and other engineers to integrate designs effectively.
Manage project budgets and timelin...
I appeared for an interview in Aug 2024.
Fiber line bled manufacturing
The bled meter measures the amount of fluid that has been bled off from a system.
The bled meter is used to monitor the bleeding of fluid from a system.
It helps in determining the amount of fluid that has been removed from the system.
The bled meter readings are important for maintaining the proper fluid levels in the system.
I have knowledge in various aspects of production engineering including process optimization, quality control, and equipment maintenance.
Knowledge of manufacturing processes and techniques
Understanding of quality control methods and tools
Experience with equipment maintenance and troubleshooting
Familiarity with lean manufacturing principles
Ability to analyze production data and identify areas for improvement
JSW Energy interview questions for popular designations
3 questions, 1 hour time
10 min of group discussion on impact of social media algo on society
Git is a version control system that tracks changes in code, while GitHub is a platform for hosting and collaborating on code.
Git is a distributed version control system used to track changes in code.
GitHub is a web-based platform for hosting Git repositories and collaborating on code.
Developers use Git to track changes, create branches, and merge code changes.
GitHub provides features like pull requests, issues, and pr...
Get interview-ready with Top JSW Energy Interview Questions
I appeared for an interview in Feb 2025, where I was asked the following questions.
posted on 27 Nov 2023
I applied via AmbitionBox
I applied via Company Website
I appeared for an interview before Feb 2024.
On the reliability and buisness development topic
On the case study of Buisness strategy
I applied via Campus Placement and was interviewed in Dec 2023. There were 3 interview rounds.
Aptitude test was of min difficulties and eqsy
Aptitude test was of min difficulties it was easy
2 python questions and some MCQ on sql
Top trending discussions
The duration of JSW Energy interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 42 interviews
Interview experience
based on 423 reviews
Rating in categories
Assistant Manager
259
salaries
| ₹5.8 L/yr - ₹14.2 L/yr |
Deputy Manager
239
salaries
| ₹7.6 L/yr - ₹21.7 L/yr |
Manager
125
salaries
| ₹10 L/yr - ₹25.5 L/yr |
Senior Manager
82
salaries
| ₹16.4 L/yr - ₹40 L/yr |
Junior Manager
79
salaries
| ₹5.3 L/yr - ₹13 L/yr |
Suzlon Group
Adani Power
ReNew
Eaton