Alarm faced in Fanuc system can be due to various reasons such as parameter errors, communication issues, or hardware malfunctions.
Check for parameter errors in the system
Ensure proper communication between the system components
Inspect hardware components for any malfunctions
Refer to the system manual for troubleshooting steps
I applied via Company Website and was interviewed in May 2023. There were 4 interview rounds.
Speaking bold, Any problems inform the seniors, Work properly, safety.
Group discussion is developed the skills and knowledge.
I appeared for an interview before Mar 2024.
The Senior Engineer role involves leading projects, mentoring teams, and driving technical innovation in engineering solutions.
Leadership: Overseeing project teams and ensuring successful delivery of engineering projects.
Technical Expertise: Applying advanced engineering principles to solve complex problems, such as optimizing system performance.
Mentorship: Guiding junior engineers and fostering their professional deve...
I can start immediately or within a two-week notice period, depending on the company's needs.
Immediate availability: I can begin right away if needed.
Two-week notice: I can provide a two-week notice to my current employer.
Flexible start date: I am open to discussing a start date that works best for the team.
JS Auto Cast Foundry interview questions for popular designations
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.
GD&T is a system of symbols and rules used to specify the geometry and allowable variations of parts and assemblies.
GD&T stands for Geometric Dimensioning and Tolerancing
It is used to communicate design intent and ensure parts are manufactured correctly
It includes symbols and rules for specifying dimensions, tolerances, and surface finishes
Examples include concentricity, perpendicularity, and flatness
GD&T is commonly u...
Various measuring instruments are used depending on the type of inspection required.
Calipers for measuring dimensions
Micrometers for precise measurements
Gauges for checking tolerances
CMMs for 3D measurements
Surface roughness testers for surface finish
Hardness testers for material hardness
Optical comparators for visual inspection
Spectrophotometers for color measurement
CAPA report is a corrective and preventive action report while inspection report is a document that records inspection findings.
CAPA report is a document that outlines the steps taken to correct and prevent non-conformances in a product or process.
Inspection report is a document that records the findings of an inspection, including any defects or issues found.
CAPA report is used to identify the root cause of a problem ...
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed in Nov 2020. There were 4 interview rounds.
based on 6 interviews
Interview experience
based on 88 reviews
Rating in categories
Quality Inspector
39
salaries
| ₹1.6 L/yr - ₹3.1 L/yr |
Junior Engineer
32
salaries
| ₹1.7 L/yr - ₹3.6 L/yr |
Senior Engineer
28
salaries
| ₹3.1 L/yr - ₹9 L/yr |
Engineer
27
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
Quality Engineer
16
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning