Filter interviews by
I applied via Walk-in and was interviewed before Mar 2022. There were 3 interview rounds.
GD&T is a system of symbols and rules used to specify the geometry and allowable variations of parts and assemblies.
GD&T stands for Geometric Dimensioning and Tolerancing
It is used to communicate design intent and ensure parts are manufactured correctly
It includes symbols and rules for specifying dimensions, tolerances, and surface finishes
Examples include concentricity, perpendicularity, and flatness
GD&T is commonly u...
Various measuring instruments are used depending on the type of inspection required.
Calipers for measuring dimensions
Micrometers for precise measurements
Gauges for checking tolerances
CMMs for 3D measurements
Surface roughness testers for surface finish
Hardness testers for material hardness
Optical comparators for visual inspection
Spectrophotometers for color measurement
CAPA report is a corrective and preventive action report while inspection report is a document that records inspection findings.
CAPA report is a document that outlines the steps taken to correct and prevent non-conformances in a product or process.
Inspection report is a document that records the findings of an inspection, including any defects or issues found.
CAPA report is used to identify the root cause of a problem ...
Alarm faced in Fanuc system can be due to various reasons such as parameter errors, communication issues, or hardware malfunctions.
Check for parameter errors in the system
Ensure proper communication between the system components
Inspect hardware components for any malfunctions
Refer to the system manual for troubleshooting steps
I applied via Company Website and was interviewed in May 2023. There were 4 interview rounds.
Speaking bold, Any problems inform the seniors, Work properly, safety.
Group discussion is developed the skills and knowledge.
I was interviewed before Mar 2024.
I can start immediately or within a two-week notice period, depending on the company's needs.
Immediate availability: I can begin right away if needed.
Two-week notice: I can provide a two-week notice to my current employer.
Flexible start date: I am open to discussing a start date that works best for the team.
JS Auto Cast Foundry interview questions for popular designations
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Statical process control
Process control
Instrument handling
Flatness perpendicularly run out
GD&T handling
Process layout product layout layout inspection and control panel, FMEA
Problem identification group discussion and man machine material method root cast analyse
Drawing and CMM instruction report handling
posted on 20 Jun 2024
I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.
They will check our patients
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.
I applied via LinkedIn and was interviewed in Jun 2024. There were 8 interview rounds.
CMM inspection report handling
Instrument handling statistical process control
Process control
Problem identification group discussion man machine material method analysing root case analyses
Drawing and GD&T handling
Layout inspection product instruction layout instruction control plan and FMEA
Parts Per Million and reaction handling control
based on 5 interviews
Interview experience
based on 85 reviews
Rating in categories
Quality Inspector
39
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
27
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Sundaram Clayton
Rane (Madras)
Ramkrishna Forgings