I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.
The goal of an aptitude test is to predict the ability to learn new skills
I applied via Campus Placement and was interviewed before Apr 2023. There were 2 interview rounds.
Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of infrastructure projects.
Involves designing and constructing buildings, bridges, roads, dams, and other structures
Focuses on ensuring structures are safe, functional, and sustainable
Requires knowledge of materials, construction techniques, and project management
Involves collaboration with architects, contractors, an...
Kalpataru Projects International interview questions for designations
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
The weight of rebar is calculated based on its diameter and length.
The weight of rebar can be calculated using the formula: weight = (d^2/162) * L, where d is the diameter in inches and L is the length in feet.
Different types of rebar have different weights per foot, so it's important to know the specific type being used.
Rebar weight is typically measured in pounds per foot or kilograms per meter.
Box girder diaphragms are typically shaped as inverted T or L shapes to provide stiffness and support to the structure.
Box girder diaphragms are designed to provide lateral support and stiffness to the bridge structure.
The shape of the diaphragm is usually inverted T or L to efficiently transfer loads and resist bending.
The diaphragm shape helps in distributing loads evenly across the bridge deck.
Examples of box girder...
IS code of mix design of concrete is IS 10262:2009
IS code for mix design of concrete is IS 10262:2009
It provides guidelines for proportioning of concrete mixes
The code covers various factors like workability, strength, durability, etc.
Get interview-ready with Top Kalpataru Projects International Interview Questions
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
QA/QC steps in MS pipe laying execution on site
Inspect the quality of MS pipes before installation
Ensure proper alignment and leveling of pipes
Check for any damages or defects in the pipes
Verify the correct placement and orientation of pipes
Perform hydrostatic testing to check for leaks
Conduct visual inspections during and after installation
Ensure proper backfilling and compaction around the pipes
Document all inspectio
The pressure during HDPE PIPE jointing process is typically around 0.5 to 0.8 MPa.
The jointing process for HDPE pipes is called butt fusion.
During butt fusion, the ends of the pipes are heated and melted using a specialized butt fusion machine.
The melted ends are then pressed together under controlled pressure to form a strong joint.
The pressure applied during the jointing process is usually maintained for a specific d...
I applied via Approached by Company and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Nov 2020. There were 3 interview rounds.
RCC structure is a reinforced concrete structure that uses steel bars to reinforce concrete.
RCC structures are commonly used in buildings, bridges, and other structures.
The design of RCC structures is governed by various codes such as IS 456:2000.
RCC structures are designed to withstand various loads such as dead load, live load, wind load, and earthquake load.
The construction of an RCC structure involves various steps...
Top trending discussions
I applied via Approached by Company
posted on 21 Jun 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
1 Interview rounds
based on 71 reviews
Rating in categories
Senior Engineer
611
salaries
| ₹3.4 L/yr - ₹10.6 L/yr |
Deputy Manager
561
salaries
| ₹5.4 L/yr - ₹19.5 L/yr |
Assistant Manager
503
salaries
| ₹3.7 L/yr - ₹14 L/yr |
Manager
279
salaries
| ₹6.2 L/yr - ₹24 L/yr |
Civil Engineer
247
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Sterlite Power
Adani Transmission
Power Grid Corporation of India
Tata Power