Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 2 interview rounds.
Top trending discussions
posted on 24 Jan 2025
posted on 28 Jan 2025
posted on 24 Dec 2024
I applied via LinkedIn and was interviewed before Dec 2023. There were 3 interview rounds.
PF can be corrected by updating the details in the PF portal and submitting necessary documents.
Update personal details in the PF portal
Submit required documents for correction
Contact HR or PF department for assistance
Energy saving procedures include optimizing lighting, HVAC systems, and equipment usage.
Implement energy-efficient lighting such as LED bulbs
Regularly maintain and tune HVAC systems for optimal performance
Use programmable thermostats to control heating and cooling
Turn off equipment when not in use to reduce standby power consumption
TPM procedures refer to Total Productive Maintenance practices aimed at maximizing equipment effectiveness and minimizing downtime.
TPM involves proactive maintenance to prevent breakdowns
Focuses on improving overall equipment efficiency
Involves training employees on equipment maintenance
Includes regular inspections and cleaning schedules
Utilizes tools like OEE (Overall Equipment Effectiveness) to measure performance
Criticality of machines can be identified based on their impact on production, safety, and downtime. They can be categorized as critical, essential, or non-essential.
Identify machines critical to production processes, where failure can lead to significant downtime or loss of revenue.
Consider machines critical to safety, where failure can pose a risk to employees or the environment.
Categorize machines as critical, essen...
Seeking new challenges and opportunities for professional growth.
Looking for new challenges and opportunities to learn and grow
Desire for career advancement and development
Seeking a more supportive work environment or better company culture
In about five years, I see myself leading a team of engineers, implementing innovative solutions, and contributing to the growth of the organization.
Leading a team of engineers in executing projects
Implementing innovative solutions to improve efficiency and quality
Contributing to the growth and success of the organization
Continuing professional development and learning new technologies
DOL (Direct-On-Line) and star delta are two different wiring schemes used in electrical engineering for starting induction motors.
DOL wiring directly connects the motor to the power supply for starting, while star delta wiring initially starts the motor in star configuration and then switches to delta configuration for running.
DOL wiring is simpler and cheaper but causes high starting current, while star delta wiring r...
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I was interviewed before Dec 2021.
Answering questions related to power plant engineering including boiler start-up and shutdown, emergencies, and 5S implementation.
Boiler cold start-up involves purging the furnace, lighting the burner, and gradually increasing the temperature and pressure.
Shutdown process involves cooling down the boiler, draining the water, and cleaning the furnace.
Types of emergencies include boiler tube leaks, fires, explosions, and...
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
posted on 27 Jan 2025
posted on 18 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 4 interview rounds.
Technical questions related job titles and experiences and job role
based on 1 interview
Interview experience
Assistant Manager
180
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Manager
84
salaries
| ₹9 L/yr - ₹25.4 L/yr |
Deputy Manager
84
salaries
| ₹6.4 L/yr - ₹17 L/yr |
Assistant Engineer
64
salaries
| ₹3.3 L/yr - ₹8.5 L/yr |
Junior Engineer
30
salaries
| ₹1.8 L/yr - ₹6.1 L/yr |
Tata Power
Adani Power
NTPC
Reliance Power