i
Filter interviews by
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jun 2022. There were 2 interview rounds.
Designing is essential for ensuring parts fit together correctly, meet performance requirements, and can be manufactured efficiently.
Designing helps ensure parts fit together correctly and function as intended
Designing allows for optimization of part performance and efficiency
Designing helps identify potential issues before production, saving time and resources
The thumb rule for welding is to ensure proper preparation, use the right welding technique, and follow safety precautions.
Ensure proper cleaning and preparation of the materials to be welded
Select the appropriate welding technique based on the materials and desired outcome
Follow safety precautions such as wearing protective gear and ensuring proper ventilation
Maintain the correct temperature and welding parameters for...
Geometric Dimensioning and Tolerancing (GD&T) is a system for defining and communicating engineering tolerances.
GD&T is a more detailed and precise way of defining dimensions and tolerances compared to traditional methods.
GD&T uses symbols, such as concentricity, flatness, and perpendicularity, to specify tolerances on drawings.
GD&T allows for clearer communication between designers, engineers, and manufacturers, reduc...
Limits, fits, and tolerance are key concepts in engineering design to ensure proper functioning of mechanical components.
Limits define the maximum and minimum acceptable dimensions of a part.
Fits refer to the clearance or interference between mating parts.
Tolerance is the allowable variation in dimensions of a part to ensure proper assembly and functionality.
For example, a shaft with a diameter of 25mm may have a toler...
Surface finishing specification indicating the roughness average in micrometers.
3.2/1.6/0.8 refers to the roughness average values in micrometers for different surfaces
The first number (3.2) represents the roughness average for the initial surface finish
The second number (1.6) represents the roughness average for the intermediate surface finish
The third number (0.8) represents the roughness average for the final surfac...
Rolls are designed based on specific criteria such as load capacity, speed, material properties, and application requirements.
Roll dimensions are selected based on load capacity requirements to ensure the roll can support the intended weight without deformation.
Speed requirements dictate the diameter of the roll to prevent slippage and maintain proper tension in the material being processed.
Material properties such as ...
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
I applied via Referral and was interviewed before Jan 2022. There was 1 interview round.
Jindal Industries Private Limited interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.
Get interview-ready with Top Jindal Industries Private Limited Interview Questions
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
The 4 P's of marketing are Product, Price, Place, and Promotion.
Product: Refers to the actual goods or services being offered to customers.
Price: The amount customers are willing to pay for the product or service.
Place: The locations where the product is sold and how it is distributed.
Promotion: The methods used to communicate with customers and persuade them to purchase the product.
The decision making process involves identifying a problem, gathering information, evaluating options, making a choice, and implementing the decision.
Identify the problem or opportunity that requires a decision
Gather relevant information and data to analyze the situation
Evaluate different options or solutions to address the problem
Make a decision based on the analysis and chosen solution
Implement the decision and monit
In my previous company, my key responsibility was to drive sales growth by developing and implementing strategic sales plans.
Developing and implementing strategic sales plans to achieve sales targets
Building and maintaining relationships with key clients and partners
Leading and motivating a sales team to meet and exceed targets
Analyzing market trends and competitor activity to identify opportunities for growth
Providing...
Lack of clear goals, ineffective communication, poor market research, and failure to adapt to changing trends.
Lack of clear goals can lead to confusion and inefficiency in executing the marketing strategy.
Ineffective communication within the team can result in misunderstandings and lack of coordination.
Poor market research can lead to targeting the wrong audience or using ineffective channels for promotion.
Failure to a...
To achieve sales target, SMART goals will be set with a focus on increasing customer base, improving product quality, and enhancing marketing strategies.
Set specific, measurable, achievable, relevant, and time-bound (SMART) goals
Increase customer base through targeted marketing campaigns and promotions
Improve product quality to increase customer satisfaction and loyalty
Enhance marketing strategies by leveraging social ...
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
I have over 10 years of experience in managing utility operations, including water, gas, and electricity.
Managed daily operations of utility systems
Developed and implemented maintenance plans
Ensured compliance with regulatory requirements
Implemented cost-saving measures
Led emergency response efforts during natural disasters
Collaborated with cross-functional teams to improve efficiency
Implemented new technologies to imp...
Major failures in heaters and boilers can lead to safety hazards and costly repairs.
Common failures include leaks, corrosion, and malfunctioning controls.
Regular maintenance and inspections can prevent these failures.
Examples of major failures include explosions, fires, and carbon monoxide poisoning.
Proper installation and use of safety devices can also prevent major failures.
The life of in bed coils of a boiler depends on various factors such as the type of fuel used, operating conditions, and maintenance.
The life of in bed coils can range from 5 to 20 years depending on the above factors.
Regular maintenance and cleaning can extend the life of in bed coils.
Using high-quality fuel and maintaining proper operating conditions can also increase the lifespan of in bed coils.
Factors such as corr...
The life of nozzles of FBC bed depends on various factors such as quality of material, operating conditions, and maintenance.
The quality of material used in the nozzles affects their lifespan.
Operating conditions such as temperature and pressure can also impact the lifespan of the nozzles.
Regular maintenance and cleaning can extend the life of the nozzles.
The lifespan of the nozzles can vary from a few months to severa
I have handled 10 chillers with a total capacity of 500 tons.
I have experience in handling both air-cooled and water-cooled chillers.
The capacities of the chillers I have handled range from 20 to 150 tons.
I have also worked on chillers with different types of refrigerants such as R-22, R-134a, and R-410a.
I was interviewed before Jun 2022.
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the Jindal Industries Private Limited interview -
The duration of Jindal Industries Private Limited interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 46 interviews
Interview experience
based on 113 reviews
Rating in categories
5-6 Yrs
Not Disclosed
Assistant Manager
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Vedanta Limited