Codes are sets of regulations and standards that govern the design, construction, and maintenance of structures.
Codes ensure safety, durability, and functionality of structures.
They provide guidelines for materials, design, construction, and inspection.
Examples of codes include International Building Code (IBC), American Society of Civil Engineers (ASCE) 7, and American Concrete Institute (ACI) 318.
Codes are regularly ...
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.
The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.
The Tremie pipe should typically be kept at a height of 1-2 meters above the pile founding level to prevent segregation of concrete.
Maintaining the correct height ensures that the concrete flows smoothly through the pipe and fills the pile without any gaps or voids.
Adjustment...
Various codes are used in structural engineering to ensure safety and compliance with regulations.
International Building Code (IBC)
American Society of Civil Engineers (ASCE) standards
American Concrete Institute (ACI) standards
American Institute of Steel Construction (AISC) standards
Eurocode
National Building Code of Canada (NBCC)
Bearings in bridges help distribute loads and allow for movement due to temperature changes and seismic activity.
Bearings help distribute the loads from the bridge deck to the substructure, reducing stress on the bridge components.
Bearings allow for movement of the bridge deck due to temperature changes, seismic activity, and other factors.
Different types of bearings include elastomeric bearings, pot bearings, and slid...
The formula used to calculate the elongation of PSC Girder is based on the modulus of elasticity and the change in length.
The formula for calculating elongation is: Elongation = (Load x Length) / (Modulus of Elasticity x Area)
Modulus of Elasticity is a measure of a material's stiffness and is specific to the material used in the PSC Girder
The change in length is the difference between the original length and the length...
The process of making PSC girder involves preparing the concrete mix, casting the girder in a formwork, curing, and testing for quality.
Prepare the concrete mix with a specific ratio of cement, aggregates, and water.
Pour the mix into a formwork that is designed to the shape and size of the girder.
Place prestressed steel strands or bars in the formwork before pouring the concrete to provide strength.
Cure the girder by m...
Socketing length in pile refers to the length of the pile that is embedded into the rock or hard strata to provide additional support and stability.
Socketing length is determined based on the strength and stability of the rock or strata at the pile tip.
It helps in transferring the load from the pile to the rock or hard strata, increasing the overall capacity of the pile.
Socketing length can vary depending on the site c...
Yes, I have extensive experience with basements and below ground structures.
I have designed and analyzed numerous basements for residential and commercial buildings.
I am familiar with waterproofing techniques and soil mechanics related to below ground structures.
I have experience with retaining walls, foundations, and underground parking structures.
I have worked on projects involving deep excavations and shoring system...
I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.
Sir casting yard area, bed alignment of survey department properly center shuttering palet panchang,and line perfect condition,
Precast segment- properly casting yard area bed alignment and survey department cordinate with checking proper center line, segment shuttering perfect ag pr drowning dimension, jig properly arrengement of bed area
I appeared for an interview in Apr 2021.
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
IS 2911 is the Indian Standard code for design and construction of pile foundations.
IS 2911 is the code for design and construction of pile foundations in India.
It covers various types of piles including driven piles, bored cast-in-situ piles, etc.
The code provides guidelines for the design, materials, construction, and testing of piles.
It ensures the safety and stability of structures supported by piles.
Example: IS 29...
The density of bentonite during piling is typically around 1.0 to 1.2 g/cm^3.
The density of bentonite can vary depending on the specific type and concentration used.
Higher density bentonite is often preferred for better support during piling operations.
Typical range of density for bentonite during piling is 1.0 to 1.2 g/cm^3.
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
Design Engineer
276
salaries
| ₹5 L/yr - ₹18 L/yr |
Senior Design Engineer
147
salaries
| ₹9 L/yr - ₹26 L/yr |
Piping Design Engineer
101
salaries
| ₹4.7 L/yr - ₹15 L/yr |
Piping Designer
88
salaries
| ₹3.4 L/yr - ₹12.8 L/yr |
Senior Engineer
73
salaries
| ₹10 L/yr - ₹21 L/yr |
L&T Construction
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation