I applied via Referral and was interviewed before Mar 2017. There were 2 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: Experience in underground metro rail station box construction & overall civil experience.

General Tips: Technical questions regarding secant piling, anchoring, rock blasting, soil excavation process, & mainly sequence of construction and managerial skills.
My advice to job seekers is, it is always better to have a good practical experience which will really help to a great extent during interviews.
Skills: Communication, Problem Solving, Leadership, Presentation Skills, Time Management
Duration: 1-4 weeks

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Regarding Technical questions interviewer asked me, like how to construct flexible pavement road ?
  • Q2. GSB CBR?
  • Q3. For One Lakh cum of soil dumping and compaction how many days require to finish ? and what is requirement of machinery unit?
  • Ans. 

    The duration and machinery requirement for dumping and compacting one lakh cum of soil.

    • The duration depends on the capacity of the machinery and the number of machines used.

    • The type of soil and the site conditions also affect the duration.

    • On average, it takes around 30-45 days to complete the task.

    • The machinery required includes excavators, bulldozers, dump trucks, and compactors.

  • Answered by AI
  • Q4.  Why we need to do C&G?
  • Q5. What is different between Minor bridge and Major bridge?
  • Ans. 

    Minor bridges are usually shorter and have a lower weight capacity than major bridges.

    • Major bridges are typically longer and have a higher weight capacity than minor bridges.

    • Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.

    • Major bridges may require more maintenance and have a higher construction cost than minor bridges.

    • Examples of major bridges i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, Be bold and talk free. Don't fear about what you don't know, explain what are you well known and believe your knowledge and keep going and learning.

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 426 Interviews
KEC International Interview Questions
4.0
 • 299 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 133 Interviews
AtkinsRealis Interview Questions
4.0
 • 87 Interviews
View all
Junior Engineer
181 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
157 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
152 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
138 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
114 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare J. Kumar Infraprojects with

Larsen & Toubro Limited

4.0
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview