Upload Button Icon Add office photos

Filter interviews by

Clear (1)

IL&FS Engineering and Construction Assistant Manager Interview Questions and Answers

Updated 15 Nov 2020

IL&FS Engineering and Construction Assistant Manager Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Regarding Technical questions interviewer asked me, like how to construct flexible pavement road ?
  • Q2. GSB CBR?
  • Q3. For One Lakh cum of soil dumping and compaction how many days require to finish ? and what is requirement of machinery unit?
  • Ans. 

    The duration and machinery requirement for dumping and compacting one lakh cum of soil.

    • The duration depends on the capacity of the machinery and the number of machines used.

    • The type of soil and the site conditions also affect the duration.

    • On average, it takes around 30-45 days to complete the task.

    • The machinery required includes excavators, bulldozers, dump trucks, and compactors.

  • Answered by AI
  • Q4.  Why we need to do C&G?
  • Q5. What is different between Minor bridge and Major bridge?
  • Ans. 

    Minor bridges are usually shorter and have a lower weight capacity than major bridges.

    • Major bridges are typically longer and have a higher weight capacity than minor bridges.

    • Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.

    • Major bridges may require more maintenance and have a higher construction cost than minor bridges.

    • Examples of major bridges i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, Be bold and talk free. Don't fear about what you don't know, explain what are you well known and believe your knowledge and keep going and learning.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I appeared for an interview before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - It's totally your luck in interview
Contribute & help others!
anonymous
You can choose to be anonymous

IL&FS Engineering and Construction Interview FAQs

What are the top questions asked in IL&FS Engineering and Construction Assistant Manager interview?

Some of the top questions asked at the IL&FS Engineering and Construction Assistant Manager interview -

  1. For One Lakh cum of soil dumping and compaction how many days require to finish...read more
  2. What is different between Minor bridge and Major bridg...read more
  3. Regarding Technical questions interviewer asked me, like how to construct flexi...read more

Recently Viewed

INTERVIEWS

Nickelfox Technologies

No Interviews

INTERVIEWS

Nickelfox Technologies

No Interviews

CAMPUS PLACEMENT

Deen Dayal Upadhyay Gorakhpur University (DDUGU)

SALARIES

Nickelfox Technologies

SALARIES

Nickelfox Technologies

SALARIES

Nickelfox Technologies

INTERVIEWS

Bahwan Engineering

No Interviews

INTERVIEWS

Nickelfox Technologies

No Interviews

JOBS

Alstom Transportation

No Jobs

REVIEWS

Bahwan Engineering

No Reviews

Tell us how to improve this page.

IL&FS Engineering and Construction Assistant Manager Salary
based on 18 salaries
₹6 L/yr - ₹10 L/yr
5% less than the average Assistant Manager Salary in India
View more details

IL&FS Engineering and Construction Assistant Manager Reviews and Ratings

based on 12 reviews

3.8/5

Rating in categories

3.1

Skill development

3.7

Work-life balance

3.3

Salary

3.5

Job security

3.1

Company culture

2.5

Promotions

3.6

Work satisfaction

Explore 12 Reviews and Ratings
Senior Engineer
41 salaries
unlock blur

₹3 L/yr - ₹7.5 L/yr

Deputy Manager
21 salaries
unlock blur

₹7.2 L/yr - ₹12.5 L/yr

Assistant Manager
18 salaries
unlock blur

₹6 L/yr - ₹10 L/yr

Engineer
17 salaries
unlock blur

₹2.2 L/yr - ₹5.1 L/yr

Electrical Engineer
14 salaries
unlock blur

₹2.1 L/yr - ₹4 L/yr

Explore more salaries
Compare IL&FS Engineering and Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Hindustan Construction Company

4.2
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview