i
Innovspatial Private Limited
Filter interviews by
I applied via Walk-in and was interviewed before Jul 2023. There were 3 interview rounds.
LOD stands for Level of Development, which defines the amount of detail and accuracy of a BIM model at different stages of a project.
LOD is a standard that specifies the content and reliability of BIM elements in a model.
It helps in understanding the level of detail and accuracy of the information contained in the model.
LOD levels range from LOD 100 (conceptual design) to LOD 500 (as-built model).
Each LOD level defines...
LOI stands for Letter of Intent, a document outlining an agreement between two or more parties before a formal contract is finalized.
LOI is a preliminary agreement that outlines the key terms and conditions of a potential deal.
It is often used in business transactions to show a serious commitment to moving forward with negotiations.
LOIs are not legally binding like a contract, but they do signify a willingness to enter...
Salary expectation should be based on industry standards, experience, qualifications, and location.
Research industry standards for Senior Bim MEP Engineer salaries
Consider your level of experience and qualifications
Take into account the cost of living in the location of the job
Be prepared to negotiate based on the overall compensation package offered
My salary expectation is based on my experience, qualifications, and the market rate for Senior Bim MEP Engineers.
Consider my years of experience in the field
Take into account my qualifications and certifications
Research the current market rate for Senior Bim MEP Engineers
Open to negotiation based on the overall compensation package
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 13 Feb 2025
I was interviewed in Jan 2025.
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Aug 2024. There was 1 interview round.
based on 1 interview
Interview experience
based on 20 reviews
Rating in categories
BIM Engineer
12
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Senior BIM Engineer
12
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
BIM Modeller
8
salaries
| ₹2.5 L/yr - ₹4.6 L/yr |
Team Lead
7
salaries
| ₹5 L/yr - ₹7.5 L/yr |
Project Manager
4
salaries
| ₹5 L/yr - ₹10 L/yr |
Cyient
RAMTeCH Software Solutions
TCS
Infosys