Filter interviews by
DCS is used for controlling processes in industries, while SCADA is used for monitoring and controlling processes in real-time.
DCS stands for Distributed Control System, used for controlling processes in industries.
SCADA stands for Supervisory Control and Data Acquisition, used for monitoring and controlling processes in real-time.
DCS is typically used in industries such as oil and gas, power plants, and manufacturing.
...
Relays work on the principle of electromagnetic attraction and repulsion to control the flow of current in a circuit.
Relays have an electromagnet which attracts an armature to make or break electrical contacts.
When current flows through the coil of the relay, it creates a magnetic field that pulls the armature towards it, closing the contacts.
When the current stops, the magnetic field disappears, and the spring returns...
RTD stands for Resistance Temperature Detector, which is a temperature sensor that operates on the principle that the electrical resistance of a metal changes with temperature.
RTD is commonly used in industrial applications for temperature measurement.
It provides accurate and stable temperature readings.
RTDs are made of pure metals like platinum, nickel, or copper.
The resistance of the RTD changes linearly with tempera...
ICS Instrumentation & Control Solution interview questions for popular designations
I applied via LinkedIn and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before May 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
GAMP 5 software categories are defined by the level of impact on product quality and patient safety.
Category 1: Infrastructure software
Category 2: Non-configured software
Category 3: Configured software
Category 4: Bespoke software
Category 5: Legacy software
Each category has different requirements for validation and testing.
Examples of software in each category include operating systems, off-the-shelf software, and custo
I applied via Referral and was interviewed in Jun 2020. There were 3 interview rounds.
Discrepancy refers to a difference or inconsistency between two or more pieces of information. It is used to identify and resolve errors or inconsistencies in data.
Discrepancy is commonly used in quality control and validation processes.
It can be identified through comparing data from different sources or through manual review.
Examples of discrepancies include mismatched data, missing information, or conflicting data.
D...
Yes, I perform validation activities as part of my job responsibilities.
I am responsible for ensuring that all processes and systems meet regulatory requirements.
I conduct validation tests and document the results.
I work closely with cross-functional teams to identify and address any issues that arise during the validation process.
Examples of validation activities I have performed include software validation, equipment
Validation deliverables include validation plan, protocols, reports, and summary.
Validation Plan: outlines the scope, approach, and resources for validation
Validation Protocols: documents the testing procedures and acceptance criteria
Validation Reports: summarizes the results of testing and any deviations from acceptance criteria
Validation Summary: provides an overall assessment of the validation process and results
Validation ensures that a product or process meets the required standards and specifications.
To ensure safety and efficacy of products
To comply with regulatory requirements
To minimize risks and errors
To improve quality and reliability
To gain customer trust and confidence
Top trending discussions
posted on 15 Jul 2024
P2P stands for Procure-to-Pay, a process that involves requisitioning, purchasing, receiving, paying for, and accounting for goods and services.
P2P is a financial and procurement process used by organizations to manage the purchasing of goods and services.
It involves steps such as requisitioning, purchasing, receiving, paying for, and accounting for goods and services.
P2P helps streamline the procurement process, impro...
posted on 23 May 2023
I applied via Naukri.com and was interviewed in Apr 2023. There was 1 interview round.
Interview experience
based on 72 reviews
Rating in categories
Executive
99
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Executive Engineer
18
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Validation Engineer
15
salaries
| ₹2 L/yr - ₹7 L/yr |
IT Executive
14
salaries
| ₹2.6 L/yr - ₹4.5 L/yr |
Senior Executive
11
salaries
| ₹3.5 L/yr - ₹9.4 L/yr |
ABB
Siemens
Honeywell Automation
Emerson Electric Co.