P2P stands for Procure-to-Pay, a process that involves requisitioning, purchasing, receiving, paying for, and accounting for goods and services.
P2P is a financial and procurement process used by organizations to manage the purchasing of goods and services.
It involves steps such as requisitioning, purchasing, receiving, paying for, and accounting for goods and services.
P2P helps streamline the procurement process, impro...
Top trending discussions
I have worked on various DCS architectures in my career, including those for chemical plants and power plants.
Designed and implemented DCS architecture for a chemical plant project
Developed DCS architecture for a power plant project
Worked on DCS architecture for a water treatment plant project
Collaborated with team to create DCS architecture for a pharmaceutical plant project
I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.
Shortlist in interview round after that training for final shortlist
I applied via Company Website and was interviewed before Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
Predictive Maintenance is a proactive approach that uses data analysis to predict equipment failures and schedule maintenance before they occur.
Predictive Maintenance uses data analysis techniques to identify patterns and trends that indicate potential equipment failures.
It involves monitoring equipment performance in real-time and collecting data on factors such as temperature, vibration, and energy consumption.
By ana...
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (measured in watts) to apparent power (measured in volt-amperes).
It indicates the efficiency of power usage in a circuit.
A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates wastage of power.
Inductive loads like electric motors have a l...
An object drawing example in 2D
Start by identifying the object you want to draw
Determine the scale and dimensions of the drawing
Use appropriate tools like rulers, compass, and protractors
Sketch the basic outline of the object
Add details and shading to enhance the drawing
Label important features or measurements
Review and refine the drawing for accuracy
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There were 2 interview rounds.
Moderate to difficult
ESD line monitoring is required for DI channels.
ESD line monitoring is necessary to prevent damage to sensitive electronic equipment.
DI channels are particularly vulnerable to ESD damage.
ESD line monitoring can be achieved through the use of ESD protection devices and regular testing.
Regular maintenance and calibration of monitoring equipment is also important.
I applied via Newspaper Ad and was interviewed in Mar 2023. There were 3 interview rounds.
Aptitude and technical
based on 1 interview
Interview experience
Project Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Design Engineer
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Analyst
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Project Engineer
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Electrical Design Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
ABB
Schneider Electric
Honeywell Automation