Filter interviews by
Be the first one to contribute and help others!
posted on 14 Jan 2025
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
QAP stands for Quality Assurance Plan and ITP stands for Inspection and Test Plan.
QAP outlines the quality control procedures and processes to be followed during a project.
ITP details the specific inspections and tests that will be conducted to ensure quality standards are met.
Both documents are essential for ensuring quality and compliance in projects.
Total stations are electronic/optical instruments used in surveying and construction to measure angles and distances.
Total stations combine a theodolite for measuring angles with a distance meter to calculate distances.
They use a laser beam to measure distances to objects.
Total stations are commonly used in construction, civil engineering, and land surveying.
They provide accurate measurements for mapping, setting out b...
Soil compaction is done to increase soil density, improve load-bearing capacity, reduce water infiltration, and enhance root growth.
Increase soil density to improve stability and reduce settling
Improve load-bearing capacity for construction projects
Reduce water infiltration to prevent erosion and improve drainage
Enhance root growth by providing a stable environment for plants
Common methods include using heavy machinery
HDPE liner is used for its durability, chemical resistance, and flexibility in various applications.
HDPE liner is chosen for its high durability, able to withstand harsh environmental conditions.
It is chemically resistant, making it ideal for use in containment systems for hazardous materials.
HDPE liner is flexible, allowing it to conform to the shape of the surface it is being applied to.
Common applications include la...
FDD tests are carried out by following a structured approach to identify defects in software development.
FDD tests involve creating test cases based on functional requirements
Tests are executed to verify if the software functions as expected
Defects found during testing are logged and prioritized for resolution
Regression testing is performed to ensure that fixes do not introduce new issues
I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.
The safety equipment per site is the responsibility of the site engineer.
Ensuring all safety equipment is available and in working condition on site
Regularly inspecting safety equipment to ensure compliance with regulations
Training site personnel on proper use of safety equipment
Maintaining records of safety equipment inspections and maintenance
Coordinating with safety officers to address any safety equipment concerns
Emergency fault found for duties requires immediate action to resolve the issue and prevent any further damage or safety hazards.
Identify the nature and location of the fault
Assess the severity of the fault and potential impact on operations
Implement immediate corrective actions to address the fault
Communicate with relevant stakeholders to coordinate response and mitigation efforts
Document the fault, actions taken, and
Psychometric test, behavioral and aptitude test
posted on 11 Oct 2024
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Internal and external quality issues require 8D methodology for CAPA resolution.
Internal quality issue refers to problems within the organization, while external quality issue refers to problems outside the organization.
8D methodology is a structured problem-solving approach that includes steps like defining the problem, implementing corrective actions, and preventing recurrence.
CAPA stands for Corrective and Preventiv...
posted on 11 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There were 2 interview rounds.
I completed a 6-month internship at a marketing firm where I gained hands-on experience in market research and campaign planning.
Conducted market research to identify target demographics
Assisted in creating marketing campaigns for new product launches
Analyzed campaign performance data to make recommendations for future strategies
CIP strengths include strong analytical skills, attention to detail, ability to work under pressure, and excellent communication skills.
Strong analytical skills - able to analyze data and make informed decisions
Attention to detail - ensures accuracy in work and minimizes errors
Ability to work under pressure - stays calm and focused in high-pressure situations
Excellent communication skills - able to effectively convey i
Milk treatment involves pasteurization, homogenization, and fortification to ensure safety and quality.
Pasteurization: Heating milk to kill harmful bacteria while preserving nutrients.
Homogenization: Breaking down fat molecules to prevent separation and create a uniform texture.
Fortification: Adding vitamins (like Vitamin D) and minerals to enhance nutritional value.
Ultra-high temperature (UHT) treatment: Heating milk
Test your skills and experience
posted on 7 Jan 2023
I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.
My working style is organized, detail-oriented, and collaborative.
I prioritize tasks and create a structured plan to meet deadlines.
I pay attention to details to ensure accuracy and quality in my work.
I enjoy collaborating with team members to brainstorm ideas and problem-solve together.
posted on 3 Oct 2024
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
I was interviewed in Nov 2024.
based on 1 review
Rating in categories
DS Group
Cargill
SGS
Cavinkare