Filter interviews by
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
QAP stands for Quality Assurance Plan and ITP stands for Inspection and Test Plan.
QAP outlines the quality control procedures and processes to be followed during a project.
ITP details the specific inspections and tests that will be conducted to ensure quality standards are met.
Both documents are essential for ensuring quality and compliance in projects.
Total stations are electronic/optical instruments used in surveying and construction to measure angles and distances.
Total stations combine a theodolite for measuring angles with a distance meter to calculate distances.
They use a laser beam to measure distances to objects.
Total stations are commonly used in construction, civil engineering, and land surveying.
They provide accurate measurements for mapping, setting out b...
Soil compaction is done to increase soil density, improve load-bearing capacity, reduce water infiltration, and enhance root growth.
Increase soil density to improve stability and reduce settling
Improve load-bearing capacity for construction projects
Reduce water infiltration to prevent erosion and improve drainage
Enhance root growth by providing a stable environment for plants
Common methods include using heavy machinery
HDPE liner is used for its durability, chemical resistance, and flexibility in various applications.
HDPE liner is chosen for its high durability, able to withstand harsh environmental conditions.
It is chemically resistant, making it ideal for use in containment systems for hazardous materials.
HDPE liner is flexible, allowing it to conform to the shape of the surface it is being applied to.
Common applications include la...
FDD tests are carried out by following a structured approach to identify defects in software development.
FDD tests involve creating test cases based on functional requirements
Tests are executed to verify if the software functions as expected
Defects found during testing are logged and prioritized for resolution
Regression testing is performed to ensure that fixes do not introduce new issues
posted on 11 Oct 2020
I applied via Referral and was interviewed in Sep 2020. There was 1 interview round.
IPAC offers a challenging and dynamic work environment with opportunities for growth and development.
IPAC has a reputation for excellence in public administration and policy
The organization values innovation and encourages employees to think creatively
IPAC provides opportunities for professional development and networking
Working at IPAC offers the chance to contribute to important public policy issues
The organization h...
Types of brick, how to check brick quality, Cement IS code and quality check, Pipe IS code
Types of bricks include clay bricks, concrete bricks, fly ash bricks, etc.
To check brick quality, look for uniform shape, size, color, sound when struck, and absence of cracks.
Cement quality is checked using IS code 12269:1987. Quality can be checked by conducting tests like fineness, setting time, compressive strength, etc.
Pipe q...
I applied via Walk-in and was interviewed before Dec 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 3 Nov 2021
Testing for oil leakage in transformers involves visual inspection, oil analysis, and pressure testing.
Visual inspection of the transformer for any signs of oil leakage
Oil analysis to check for any abnormal levels of dissolved gases or contaminants
Pressure testing to check for any leaks in the transformer's oil-filled compartments
Use of ultrasonic testing to detect any leaks in the transformer's tank
Regular maintenance
I will conduct a thorough testing and inspection process to identify any errors in the Feeder.
Perform visual inspection of the Feeder
Conduct electrical testing to ensure proper functioning
Check for any loose connections or damaged components
Compare the Feeder's performance to the expected results
Review any error logs or system alerts
Consult with colleagues or experts for additional input
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
General SSC level aptitude
posted on 2 May 2024
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.
Electrical and Electronic test
posted on 9 Jan 2022
I applied via Other and was interviewed before Jan 2021. There was 1 interview round.
IPAC stands for Integrated Public Alert and Warning System. It is a national alert and warning system in the United States.
IPAC is designed to provide timely and accurate alerts and warnings to the public during emergencies and disasters.
It is managed by the Federal Emergency Management Agency (FEMA) in partnership with other federal agencies, state and local governments, and the private sector.
IPAC can send alerts thr...
based on 1 interview
Interview experience
Inspection Engineer
467
salaries
| ₹1.1 L/yr - ₹8.5 L/yr |
Chemist
330
salaries
| ₹1.1 L/yr - ₹7.2 L/yr |
Executive
211
salaries
| ₹2 L/yr - ₹8.7 L/yr |
Senior Executive
174
salaries
| ₹2.9 L/yr - ₹12.2 L/yr |
Assistant Manager
118
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Bureau Veritas
CMS Infosystems
Intertek
Medhaj Techno Concept