H.G. Infra Engineering Senior Manager Interview Questions and Answers for Experienced

Updated 8 Dec 2023

H.G. Infra Engineering Senior Manager Interview Experiences for Experienced

2 interviews found

Senior Manager Interview Questions & Answers

user image Dusmanta Dash

posted on 8 Dec 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. About the personal and education qualifications
  • Q2. Professional experience
  • Q3. Professional reference

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company.

I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell about your experience with family details

Interview Preparation Tips

Interview preparation tips for other job seekers - Talent acquisition team is Very good and employee oriented organization.

Senior Manager Interview Questions Asked at Other Companies for undefined

Q1. 1. What you understand the requirement of shuttering material at ... read more
asked in Tata Motors
Q2. Types of pumps and for which process which types of pumps are req ... read more
asked in Yes Bank
Q3. Which funds do you recommend for long term Investment in mutual f ... read more
asked in Tata Motors
Q4. Share some of the Productivity Improvement Ideas for Machine Shop
Q5. Can you please draw a 2D drawing of connecting rod in the CAd sof ... read more

Interview questions from similar companies

Interview Questionnaire 

10 Questions

  • Q1. 1. What you understand the requirement of shuttering material at project site?
  • Ans. 

    Shuttering material refers to temporary structures used in construction projects to support concrete during the curing process.

    • Shuttering material is required to provide formwork support for concrete structures.

    • It helps in creating the desired shape and structure of the concrete element.

    • Common types of shuttering materials include plywood, steel, aluminum, and plastic.

    • The choice of material depends on factors like proj...

  • Answered by AI
  • Q2. 2.Do you able to formulate claim raising and defending strategy basis on contractual provision ?
  • Ans. 

    Yes

    • Yes, I am able to formulate claim raising and defending strategies based on contractual provisions.

    • I have extensive experience in contract management and have successfully raised and defended claims in my previous roles.

    • I am well-versed in analyzing contractual provisions and identifying the relevant clauses for formulating effective strategies.

    • I have a strong understanding of contract law and can leverage it to dev...

  • Answered by AI
  • Q3. 3. What do you understand about preliminary drawing, as-built drawing, drawing schedule, proof checking ?
  • Ans. 

    Preliminary drawing, as-built drawing, drawing schedule, and proof checking are all important aspects of the design and construction process.

    • Preliminary drawing: Initial sketches or plans that outline the basic design concept.

    • As-built drawing: Final drawings that reflect any changes made during construction.

    • Drawing schedule: A timeline or list that outlines when each drawing is expected to be completed.

    • Proof checking: ...

  • Answered by AI
  • Q4. 4. How of sources and requirement (quantity) of materials in projects as per tender ?
  • Ans. 

    The sources and quantity of materials in projects are determined based on the tender requirements.

    • The sources of materials in projects are determined through a procurement process.

    • The quantity of materials required is specified in the tender documents.

    • The tender documents may include a bill of quantities or a detailed scope of work.

    • The procurement team evaluates potential suppliers and selects the most suitable ones.

    • Th...

  • Answered by AI
  • Q5. 5.Explore your knowledge of automated systems, software and IT applications such as MS Project, Prima Vera, SAP, AutoCAD, Auto Plotter, Road Estimator & CalCquen.
  • Q6. 6. Rate Analysis of Earth Work for Road Project.
  • Ans. 

    Rate analysis of earthwork for road project involves calculating the cost of excavation, transportation, and compaction of soil.

    • Rate analysis helps in estimating the cost of earthwork for road construction.

    • It involves determining the quantity of earthwork required and the rates for excavation, transportation, and compaction.

    • The rates are based on factors like the type of soil, distance of transportation, and equipment ...

  • Answered by AI
  • Q7. 7. What is S-Curve ? Explain with example.
  • Ans. 

    The S-Curve is a graphical representation of the growth or progress of a project or business over time.

    • The S-Curve is named after its shape, which resembles the letter 'S'.

    • It is commonly used in project management to track and visualize the progress of tasks or activities.

    • The curve typically shows slow progress at the beginning, followed by a rapid growth phase, and then a tapering off towards the end.

    • The S-Curve helps...

  • Answered by AI
  • Q8. 8. Haw can you prepare R0 Budget for a Road Project ? Describe sequence in brief.
  • Ans. 

    Preparing a R0 budget for a road project involves several steps and considerations.

    • Identify the scope and objectives of the road project

    • Estimate the quantities of materials and resources required

    • Determine the unit costs of materials, labor, and equipment

    • Calculate the total cost for each item and activity

    • Consider any contingencies or unforeseen expenses

    • Sum up the costs to create the overall budget

    • Review and refine the b

  • Answered by AI
  • Q9. 9. What is Change of Scope in Road Project ? Describe sequence in brief.
  • Ans. 

    Change of Scope in a road project refers to any modifications or alterations made to the original project plan.

    • Change of scope can include changes in project objectives, deliverables, timelines, or budget.

    • It may involve adding or removing features, adjusting the project scope, or redefining project requirements.

    • For example, if a road project initially planned to construct a two-lane road but later decides to expand it ...

  • Answered by AI
  • Q10. 10. What is Price Adjustment ? What is its role in Project Cost ? How to calculate it ?
  • Ans. 

    Price adjustment is a mechanism to account for changes in project costs. It helps in maintaining project profitability.

    • Price adjustment is a provision in a contract that allows for changes in project costs due to various factors such as inflation, currency fluctuations, or changes in material prices.

    • Its role in project cost is to ensure that the project remains financially viable and profitable despite cost fluctuation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be cool and clam during Interview. Do not hesitate. Most of the Answers of asked Questions has been already very conversant with you and it is related to your routine/periodic work. Do not make any specific strategy. If any Questions are beyond your knowledge, please say clearly sorry.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(2 Questions)

  • Q1. Self identify and what is the roles and responsible
  • Ans. 

    As a Senior Manager, I self-identify as a leader with strong communication skills and strategic vision.

    • Lead and manage a team to achieve organizational goals

    • Develop and implement strategic plans

    • Communicate effectively with stakeholders

    • Provide guidance and support to team members

    • Analyze data and make informed decisions

    • Ensure compliance with company policies and regulations

  • Answered by AI
  • Q2. Required time
Round 2 - One-on-one 

(2 Questions)

  • Q1. All my experience
  • Q2. Working periods
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Costing for transmission line
  • Ans. 

    Costing for transmission line involves calculating the total expenses for materials, labor, equipment, and overhead costs.

    • Calculate the total length of the transmission line needed

    • Estimate the cost of materials such as cables, poles, insulators, and connectors

    • Factor in labor costs for installation and maintenance

    • Include equipment costs for specialized tools and machinery

    • Consider overhead costs such as permits, land acq...

  • Answered by AI
  • Q2. Execution of transmission line
  • Ans. 

    Execution of transmission line involves planning, design, construction, and maintenance of power lines.

    • Planning involves route selection, environmental impact assessment, and obtaining necessary permits.

    • Design includes determining the type of towers, conductor size, and insulator selection.

    • Construction involves clearing the right-of-way, setting foundations, erecting towers, and stringing conductors.

    • Maintenance include...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Senior Manager interview:
  • Project Management
Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What are your strengths
Round 2 - HR 

(2 Questions)

  • Q1. Reason for changing my job
  • Q2. Current Cost To Company
  • Ans. 

    My current Cost To Company is $120,000 per year.

    • My current Cost To Company includes my salary, benefits, bonuses, and any other compensation provided by the company.

    • It is important to consider the total value of all components of the compensation package when discussing Cost To Company.

    • For example, my salary is $100,000 per year, with an additional $20,000 in benefits and bonuses.

    • The Cost To Company may vary based on i

  • Answered by AI

I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Details of past projects
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why are you looking for a change?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well for ur work done and ask for a competitive package
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Three round of Technical Interview
  • Q2. Basically they all will ask about your previous Projects, Questions are from your CV only. Prepare for your strength and weakness answer. also your biggest achievements in your career.
  • Q3. Your current project
  • Q4. As you are working on
Round 3 - Technical 

(1 Question)

  • Q1. Strength and weakness
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Aptitude Test 

Numerical reasoning and verbal reasoning followed by psychometric assessment.

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Accomodation and vechile facilities need .

Interview Preparation Tips

Interview preparation tips for other job seekers - In reliance they not give accommodation and vechile facilities to reach site. Only problem was a big problem. Company good

H.G. Infra Engineering Interview FAQs

How many rounds are there in H.G. Infra Engineering Senior Manager interview for experienced candidates?
H.G. Infra Engineering interview process for experienced candidates usually has 2 rounds. The most common rounds in the H.G. Infra Engineering interview process for experienced candidates are Resume Shortlist and HR.
How to prepare for H.G. Infra Engineering Senior Manager interview for experienced candidates?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at H.G. Infra Engineering. The most common topics and skills that interviewers at H.G. Infra Engineering expect are Senior Management, Bid Management, Business Development, Kintana and Learning.

Tell us how to improve this page.

H.G. Infra Engineering Senior Manager Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more
H.G. Infra Engineering Senior Manager Salary
based on 37 salaries
₹10.6 L/yr - ₹22 L/yr
26% less than the average Senior Manager Salary in India
View more details

H.G. Infra Engineering Senior Manager Reviews and Ratings

based on 14 reviews

4.1/5

Rating in categories

4.1

Skill development

3.7

Work-life balance

3.8

Salary

3.7

Job security

3.8

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 14 Reviews and Ratings
Assistant Manager
121 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
84 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
78 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
69 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Structural Engineer
67 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare H.G. Infra Engineering with

Ashoka Buildcon

4.1
Compare

IRB Infrastructure

4.0
Compare

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview