Group-108 MEP Engineer Interview Questions and Answers

Updated 20 Jan 2025

Group-108 MEP Engineer Interview Experiences

1 interview found

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 20 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is fire fighting
  • Q2. What about chillar
Round 2 - Technical 

(2 Questions)

  • Q1. What is hvac system
  • Q2. What about 33 kv sld

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Construction in civil

Round 2 - HR 

(2 Questions)

  • Q1. About dra homes
  • Q2. Technical questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution process
  • Q2. Building rules and laws

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Bulding related
  • Q2. Bulding work process
  • Q3. Bulding detail work
  • Q4. Drawing making detail work
  • Q5. All detail bulding construction
  • Ans. 

    Building construction involves the process of planning, designing, and constructing structures.

    • Building construction includes various stages such as site preparation, foundation construction, structural framing, and finishing.

    • It involves the use of materials like concrete, steel, wood, and bricks.

    • Construction techniques and methods vary depending on the type of building, such as residential, commercial, or industrial.

    • B...

  • Answered by AI
Round 2 - Case Study 

Bulding drawing seen

Round 3 - Group Discussion 

Work & process detial

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is total flot
  • Ans. 

    Total float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total float is calculated by subtracting the early start date of an activity from its late start date.

    • Activities with total float can be delayed without affecting the project's critical path.

    • Total float is also known as slack.

    • Total float is important for project scheduling and helps in managing project time

  • Answered by AI
  • Q2. Total flot which we can delay the project without delay finish date
  • Ans. 

    Total float is the amount of time that a schedule activity can be delayed without delaying the project finish date.

    • Total float is calculated by subtracting the early start date of an activity from its late start date.

    • Activities with total float can be delayed without affecting the project finish date.

    • Total float helps in identifying activities that have flexibility in their start and finish dates.

    • It is important to mon...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General mcq questions related to work and civil engineering

Round 3 - Technical 

(3 Questions)

  • Q1. Prepare everything related to field work of site. Will be a pro
  • Q2. What is curing period of concrete
  • Ans. 

    Curing period of concrete is the duration during which the concrete is kept moist to ensure proper hydration and strength development.

    • Curing period typically lasts for 7 to 28 days depending on the type of concrete mix and environmental conditions.

    • Proper curing helps in reducing cracks, increasing durability, and achieving desired strength.

    • Common curing methods include ponding, wet covering, and using curing compounds.

    • ...

  • Answered by AI
  • Q3. How is brick masonry done
  • Ans. 

    Brick masonry is the process of laying bricks in a specific pattern using mortar to create walls, buildings, or other structures.

    • Prepare the surface by cleaning and wetting it

    • Lay a bed of mortar on the surface

    • Place the bricks in the desired pattern, tapping them into place with a trowel

    • Use a spirit level to ensure the bricks are level and plumb

    • Fill the joints between the bricks with mortar and finish them off neatly

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Introduction youre self
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Approached by Company

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to calculate cable size?
  • Ans. 

    Cable size can be calculated based on current carrying capacity, voltage drop, and installation conditions.

    • Determine the current carrying capacity required for the cable based on the load

    • Calculate the voltage drop allowed for the cable based on the distance and voltage rating

    • Consider the installation conditions such as ambient temperature and grouping of cables

    • Use cable sizing charts or online calculators to find the a

  • Answered by AI
  • Q2. What is mean of sq mm ?
  • Ans. 

    Sq mm stands for square millimeter, a unit of area measurement.

    • Sq mm is a unit of measurement used to quantify the area of a two-dimensional space.

    • It is equal to the area of a square with sides measuring 1 millimeter each.

    • Commonly used in engineering and construction for measuring small areas.

    • Example: A sheet of paper may have dimensions of 210 mm x 297 mm, which is equivalent to 62370 sq mm.

  • Answered by AI

Group-108 Interview FAQs

How many rounds are there in Group-108 MEP Engineer interview?
Group-108 interview process usually has 2 rounds. The most common rounds in the Group-108 interview process are Technical.
What are the top questions asked in Group-108 MEP Engineer interview?

Some of the top questions asked at the Group-108 MEP Engineer interview -

  1. What is fire fight...read more
  2. What is hvac sys...read more
  3. What about 33 kv ...read more

Tell us how to improve this page.

Group-108 MEP Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Novel Office Interview Questions
4.0
 • 45 Interviews
Omaxe Interview Questions
4.1
 • 35 Interviews
DEC Infra Interview Questions
3.7
 • 22 Interviews
Arkade Group Interview Questions
4.5
 • 20 Interviews
JP Infra Interview Questions
3.8
 • 18 Interviews
DRA Homes Interview Questions
4.6
 • 18 Interviews
Runwal Group Interview Questions
3.7
 • 17 Interviews
View all

Group-108 MEP Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
4 salaries
unlock blur

₹4.2 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Group-108 with

Omaxe

4.1
Compare

Realty Assistant

4.3
Compare

Runwal Group

3.8
Compare

Mahindra Lifespace Developers

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview