Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Group-108 Team. If you also belong to the team, you can get access from here

Group-108 Verified Tick

Compare button icon Compare button icon Compare
3.1

based on 17 Reviews

Filter interviews by

Group-108 MEP Engineer Interview Questions and Answers

Updated 20 Jan 2025

Group-108 MEP Engineer Interview Experiences

1 interview found

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 20 Jan 2025

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is fire fighting
  • Q2. What about chillar
Round 2 - Technical 

(2 Questions)

  • Q1. What is hvac system
  • Q2. What about 33 kv sld

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Construction in civil

Round 2 - HR 

(2 Questions)

  • Q1. About dra homes
  • Q2. Technical questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Internal plaster thickness and ratio?
  • Ans. 

    Internal plaster thickness and ratio are important factors in construction projects.

    • The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.

    • The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).

    • The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.

  • Answered by AI
  • Q2. Process of slab checking?
  • Ans. 

    Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.

    • Check for proper reinforcement placement and spacing

    • Verify concrete mix design and curing process

    • Inspect for any cracks or defects

    • Ensure slab thickness meets design specifications

    • Perform load testing if necessary

  • Answered by AI
  • Q3. External Plaster thickness and ratio?
  • Ans. 

    External plaster thickness and ratio are determined based on the type of surface and desired finish.

    • External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.

    • The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.

    • For better adhesion, a bonding agent may be added to the plaster mix.

    • Proper curing is essential to ensure the stren

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I will try my best technical knowledge provide for your company...
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What's Your Name
  • Ans. 

    My name is John Smith, a civil engineer with 10 years of experience in infrastructure projects.

    • My name is John Smith

    • I have 10 years of experience in civil engineering

    • I specialize in infrastructure projects

  • Answered by AI
  • Q2. Where Your Form
  • Ans. 

    I am currently working at a construction firm in New York City.

    • I am currently employed at a construction firm in New York City.

    • I have experience working on various infrastructure projects in the city.

    • I am familiar with the building codes and regulations in New York City.

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What Is Concrete
  • Ans. 

    Concrete is a mixture of cement, water, aggregates, and sometimes additives, used in construction for its strength and durability.

    • Concrete is made up of cement, water, and aggregates (such as sand and gravel)

    • It is a versatile material used in construction for buildings, roads, bridges, and more

    • Additives can be included in concrete mixtures to enhance specific properties, such as strength or workability

    • Concrete hardens ...

  • Answered by AI
  • Q2. What Is Structure
  • Ans. 

    Structure in civil engineering refers to the arrangement and organization of elements in a building or infrastructure to support loads and resist forces.

    • Structure is the framework or skeleton of a building or infrastructure that supports the weight of the building and its occupants.

    • It includes elements such as beams, columns, walls, and foundations that work together to provide stability and strength.

    • Structural design ...

  • Answered by AI
  • Q3. High Rise Building

Interview Preparation Tips

Topics to prepare for Rajhans (Desai-Jain) Group Civil Engineer interview:
  • Quality Control
  • Infrastructure
  • Building Construction
  • Brick Work
Interview preparation tips for other job seekers - Hello Sir

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution process
  • Q2. Building rules and laws

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2024.

Round 1 - Technical 

(5 Questions)

  • Q1. Bulding related
  • Q2. Bulding work process
  • Q3. Bulding detail work
  • Q4. Drawing making detail work
  • Q5. All detail bulding construction
  • Ans. 

    Building construction involves the process of planning, designing, and constructing structures.

    • Building construction includes various stages such as site preparation, foundation construction, structural framing, and finishing.

    • It involves the use of materials like concrete, steel, wood, and bricks.

    • Construction techniques and methods vary depending on the type of building, such as residential, commercial, or industrial.

    • B...

  • Answered by AI
Round 2 - Case Study 

Bulding drawing seen

Round 3 - Group Discussion 

Work & process detial

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is total flot
  • Ans. 

    Total float is the amount of time a schedule activity can be delayed without delaying the project completion date.

    • Total float is calculated by subtracting the early start date of an activity from its late start date.

    • Activities with total float can be delayed without affecting the project's critical path.

    • Total float is also known as slack.

    • Total float is important for project scheduling and helps in managing project time

  • Answered by AI
  • Q2. Total flot which we can delay the project without delay finish date
  • Ans. 

    Total float is the amount of time that a schedule activity can be delayed without delaying the project finish date.

    • Total float is calculated by subtracting the early start date of an activity from its late start date.

    • Activities with total float can be delayed without affecting the project finish date.

    • Total float helps in identifying activities that have flexibility in their start and finish dates.

    • It is important to mon...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

General mcq questions related to work and civil engineering

Round 3 - Technical 

(3 Questions)

  • Q1. Prepare everything related to field work of site. Will be a pro
  • Q2. What is curing period of concrete
  • Ans. 

    Curing period of concrete is the duration during which the concrete is kept moist to ensure proper hydration and strength development.

    • Curing period typically lasts for 7 to 28 days depending on the type of concrete mix and environmental conditions.

    • Proper curing helps in reducing cracks, increasing durability, and achieving desired strength.

    • Common curing methods include ponding, wet covering, and using curing compounds.

    • ...

  • Answered by AI
  • Q3. How is brick masonry done
  • Ans. 

    Brick masonry is the process of laying bricks in a specific pattern using mortar to create walls, buildings, or other structures.

    • Prepare the surface by cleaning and wetting it

    • Lay a bed of mortar on the surface

    • Place the bricks in the desired pattern, tapping them into place with a trowel

    • Use a spirit level to ensure the bricks are level and plumb

    • Fill the joints between the bricks with mortar and finish them off neatly

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Introduction youre self
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maivan work know waterproofing work check, brick work, plastering, painting, putty, primary , gypsum work know, falceling, tile marvel, granite, wooden work know, upvc mep railing scating work check,
  • Q2. Any question & answer i can speak

Interview Preparation Tips

Interview preparation tips for other job seekers - I can speak English, hindi, odia, finishing work total know, stacher
My present company my home group
My pvc company aparna construction

Group-108 Interview FAQs

How many rounds are there in Group-108 MEP Engineer interview?
Group-108 interview process usually has 2 rounds. The most common rounds in the Group-108 interview process are Technical.
What are the top questions asked in Group-108 MEP Engineer interview?

Some of the top questions asked at the Group-108 MEP Engineer interview -

  1. What is fire fight...read more
  2. What is hvac sys...read more
  3. What about 33 kv ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Novel Office Interview Questions
4.0
 • 45 Interviews
Omaxe Interview Questions
4.1
 • 35 Interviews
DEC Infra Interview Questions
3.7
 • 22 Interviews
Arkade Group Interview Questions
4.5
 • 20 Interviews
JP Infra Interview Questions
3.8
 • 18 Interviews
DRA Homes Interview Questions
4.6
 • 18 Interviews
Runwal Group Interview Questions
3.7
 • 17 Interviews
View all

Group-108 MEP Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
4 salaries
unlock blur

₹4.2 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Group-108 with

Omaxe

4.1
Compare

Realty Assistant

4.2
Compare

Runwal Group

3.7
Compare

Mahindra Lifespace Developers

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview