I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
Construction in civil
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
posted on 20 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
My name is John Smith, a civil engineer with 10 years of experience in infrastructure projects.
My name is John Smith
I have 10 years of experience in civil engineering
I specialize in infrastructure projects
I am currently working at a construction firm in New York City.
I am currently employed at a construction firm in New York City.
I have experience working on various infrastructure projects in the city.
I am familiar with the building codes and regulations in New York City.
Concrete is a mixture of cement, water, aggregates, and sometimes additives, used in construction for its strength and durability.
Concrete is made up of cement, water, and aggregates (such as sand and gravel)
It is a versatile material used in construction for buildings, roads, bridges, and more
Additives can be included in concrete mixtures to enhance specific properties, such as strength or workability
Concrete hardens ...
Structure in civil engineering refers to the arrangement and organization of elements in a building or infrastructure to support loads and resist forces.
Structure is the framework or skeleton of a building or infrastructure that supports the weight of the building and its occupants.
It includes elements such as beams, columns, walls, and foundations that work together to provide stability and strength.
Structural design ...
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I was interviewed in Jan 2024.
Building construction involves the process of planning, designing, and constructing structures.
Building construction includes various stages such as site preparation, foundation construction, structural framing, and finishing.
It involves the use of materials like concrete, steel, wood, and bricks.
Construction techniques and methods vary depending on the type of building, such as residential, commercial, or industrial.
B...
Bulding drawing seen
Work & process detial
Total float is the amount of time a schedule activity can be delayed without delaying the project completion date.
Total float is calculated by subtracting the early start date of an activity from its late start date.
Activities with total float can be delayed without affecting the project's critical path.
Total float is also known as slack.
Total float is important for project scheduling and helps in managing project time
Total float is the amount of time that a schedule activity can be delayed without delaying the project finish date.
Total float is calculated by subtracting the early start date of an activity from its late start date.
Activities with total float can be delayed without affecting the project finish date.
Total float helps in identifying activities that have flexibility in their start and finish dates.
It is important to mon...
posted on 26 Jul 2023
General mcq questions related to work and civil engineering
Curing period of concrete is the duration during which the concrete is kept moist to ensure proper hydration and strength development.
Curing period typically lasts for 7 to 28 days depending on the type of concrete mix and environmental conditions.
Proper curing helps in reducing cracks, increasing durability, and achieving desired strength.
Common curing methods include ponding, wet covering, and using curing compounds.
...
Brick masonry is the process of laying bricks in a specific pattern using mortar to create walls, buildings, or other structures.
Prepare the surface by cleaning and wetting it
Lay a bed of mortar on the surface
Place the bricks in the desired pattern, tapping them into place with a trowel
Use a spirit level to ensure the bricks are level and plumb
Fill the joints between the bricks with mortar and finish them off neatly
posted on 23 May 2024
I applied via Walk-in
based on 1 review
Rating in categories
Assistant Manager
4
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Omaxe
Realty Assistant
Runwal Group
Mahindra Lifespace Developers