The question is unclear and lacks context. Please provide more information.
Please clarify the question and provide more context.
It is unclear what 'stanth of sleepar' refers to.
Without more information, it is impossible to provide a meaningful answer.
Seating of sleepers is done by proshesh method in civil engineering.
Proshesh method involves placing the sleepers on a layer of ballast and then packing the ballast around the sleepers.
The ballast is then compacted using a tamping machine to ensure proper seating of the sleepers.
Proper seating of sleepers is important to ensure stability and safety of the railway track.
The proshesh method is commonly used in railway tr
Standard seating time refers to the time period for which a person can comfortably sit without experiencing discomfort or pain.
Standard seating time varies depending on the individual's age, weight, and health conditions.
For a healthy adult, the standard seating time is around 30-60 minutes.
For elderly people or those with back problems, the standard seating time may be shorter.
Taking breaks and stretching during prolo...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
Billing codes are determined by the organization and industry standards.
Billing codes are used to identify specific products or services provided by an organization.
The codes are typically determined by the organization and may also follow industry standards.
Examples of billing codes include CPT codes for medical procedures and UPC codes for retail products.
Assistant Engineer
30
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Project Engineer
15
salaries
| ₹4.1 L/yr - ₹8.8 L/yr |
Junior Engineer Civil
14
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Safety Officer
13
salaries
| ₹3.1 L/yr - ₹5.5 L/yr |
Assistant Engineer - Civil
13
salaries
| ₹3.2 L/yr - ₹6 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon