The typical slab cycle duration varies depending on the type of slab and construction method.
Slab cycle duration can range from a few days to several weeks.
Factors that affect the duration include the type of concrete used, curing time, and weather conditions.
For example, a typical cycle for a post-tensioned slab may take around 14 days, while a conventionally reinforced slab may take around 21 days.
During this time, t...
Top trending discussions
posted on 10 Jul 2024
Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
posted on 10 Jul 2024
Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.
The quantity of cement in M25 grade concrete is 350 kg/m³.
M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).
The total volume of concrete is taken as 1 m³.
Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.
This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.
The weight of steel varies with its diameter.
The weight of steel can be calculated using the formula: weight = volume x density
The density of steel is approximately 7850 kg/m³
The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length
For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg
Waterproofing is the process of making a structure or object resistant to water penetration.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Clean and prepare the surface to be waterproofed.
Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.
Ensure proper drainage and slope to prevent water accumulation.
Test the waterproofing system for leaks and make n...
Conversion of brass to Cum
Brass is an alloy of copper and zinc, while Cum is not a known substance
It is not possible to convert brass to Cum
Perhaps the question is referring to a different substance or material
I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Senior Engineer
25
salaries
| ₹4.1 L/yr - ₹9.5 L/yr |
Sales Manager
25
salaries
| ₹4.2 L/yr - ₹7.6 L/yr |
PRE Sales Executive
16
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Junior Engineer Civil
15
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Senior Civil Engineer
15
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Puravankara
Sobha
Brigade Group
Godrej Properties