Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Typical Slab cycle duration & details,
  • Ans. 

    The typical slab cycle duration varies depending on the type of slab and construction method.

    • Slab cycle duration can range from a few days to several weeks.

    • Factors that affect the duration include the type of concrete used, curing time, and weather conditions.

    • For example, a typical cycle for a post-tensioned slab may take around 14 days, while a conventionally reinforced slab may take around 21 days.

    • During this time, t...

  • Answered by AI
  • Q2. Material reconciliation % allowance

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep ready finger Tips figure for different coefficient about material & manpower productivity
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1.Waterproofing process 2.Tiling process 3. External plaster work process

Interview Preparation Tips

Interview preparation tips for other job seekers - Preparation for basic knowledge of construction work

Senior Civil Engineer Interview Questions Asked at Other Companies

Q1. Why reinforcement is provided alternative in column?
Q2. How much accepted 8mm to 10mm steel rod rolling margine value ?
Q3. Do you have idea about safety and safety rules at L&T?
asked in Dr. Reddy's
Q4. What is the estimated cost of 100 feet by 100 feet of office in t ... read more
Q5. What is the slump range for boom pressure?

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Bbs Billing Estimation Purchase

Interview Preparation Tips

Interview preparation tips for other job seekers - Bbs
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Bbs Billing Estimation Purchase

Interview Preparation Tips

Interview preparation tips for other job seekers - Bbs

Goel Ganga Developments Interview FAQs

How many rounds are there in Goel Ganga Developments Senior Civil Engineer interview?
Goel Ganga Developments interview process usually has 2 rounds. The most common rounds in the Goel Ganga Developments interview process are Resume Shortlist and Technical.
What are the top questions asked in Goel Ganga Developments Senior Civil Engineer interview?

Some of the top questions asked at the Goel Ganga Developments Senior Civil Engineer interview -

  1. Typical Slab cycle duration & detai...read more
  2. 1.Waterproofing process 2.Tiling process 3. External plaster work proc...read more
  3. material reconciliation % allowa...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 123 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 72 Interviews
Brigade Group Interview Questions
4.2
 • 32 Interviews
Sunteck Realty Interview Questions
3.4
 • 21 Interviews
Puravankara Interview Questions
3.8
 • 18 Interviews
View all
Goel Ganga Developments Senior Civil Engineer Salary
based on 15 salaries
₹4 L/yr - ₹8.4 L/yr
17% less than the average Senior Civil Engineer Salary in India
View more details

Goel Ganga Developments Senior Civil Engineer Reviews and Ratings

based on 3 reviews

1.9/5

Rating in categories

2.2

Skill development

3.3

Work-Life balance

2.1

Salary & Benefits

4.2

Job Security

1.8

Company culture

1.0

Promotions/Appraisal

1.5

Work Satisfaction

Explore 3 Reviews and Ratings
Senior Engineer
25 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Sales Manager
25 salaries
unlock blur

₹4.2 L/yr - ₹7.6 L/yr

PRE Sales Executive
16 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Junior Engineer Civil
15 salaries
unlock blur

₹1.7 L/yr - ₹4.5 L/yr

Senior Civil Engineer
15 salaries
unlock blur

₹4 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Goel Ganga Developments with

Puravankara

3.8
Compare

Sobha

3.9
Compare

Brigade Group

4.2
Compare

Godrej Properties

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview