i
G R Infraprojects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed in Nov 2023. There were 3 interview rounds.
Sanik school G+2 , Quantity survey, estimation and costing
Top trending discussions
posted on 27 Jan 2025
I was interviewed in Jul 2024.
Slamp test , concrete me water ki matra kitni honi chiye esse pta krte hai or ye concrete ki strength pr kafi effective hota hai.
Gas pipeline work involves the installation, maintenance, and repair of pipelines for the transportation of natural gas.
Gas pipeline work requires knowledge of pipeline design, construction, and safety regulations.
Engineers must ensure proper installation and maintenance to prevent leaks and ensure efficient gas transportation.
Examples of gas pipeline work include inspecting pipelines for corrosion, repairing leaks, an...
posted on 16 Jun 2024
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Cement consumption of M20 concrete mix ratio is 360 kg/m3.
M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)
Cement consumption for 1 m3 of M20 concrete is 360 kg
To calculate total cement consumption, multiply 360 kg by the volume of concrete needed
Extra items added in billing should be justified with proper documentation and approval.
Ensure that the extra item was actually used on the project
Check if the extra item was approved by the client or project manager
Document the reason for adding the extra item in the billing
Provide evidence such as photos or receipts to support the inclusion of the extra item
Rate analysis involves calculating the cost of various items in a construction project.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.
Rate analysis is essential for accurate budgeting and cost estimation in construction projects.
For example, in...
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
I was interviewed in Apr 2023.
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
I applied via Referral and was interviewed in Jun 2022. There was 1 interview round.
The technical specification of a boom placer includes details about its lifting activities and repair maintenance.
Technical specification of a boom placer includes information about its capacity, reach, and lifting height.
Lifting activities of a boom placer involve the movement and placement of heavy objects or materials.
Repair maintenance of a boom placer includes regular inspections, lubrication, and replacement of w...
Yes, I have a documentation process for my work as a Site Engineer.
I maintain detailed records of all project activities, including plans, specifications, and progress reports.
I use standardized templates and forms to document site inspections, quality control checks, and safety procedures.
I organize and file all documentation in a systematic manner for easy retrieval and reference.
I regularly update and communicate ch...
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Manager
293
salaries
| ₹4.6 L/yr - ₹11.5 L/yr |
Senior Engineer
226
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Structural Engineer
145
salaries
| ₹1.8 L/yr - ₹6.3 L/yr |
Engineer
137
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Executive
132
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Nagarjuna Construction Company
PNC Infratech
Ashoka Buildcon
IRB Infrastructure