i
G R Infraprojects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I appeared for an interview in Jan 2025.
The number of beam lapping zones depends on the specific design and requirements of the project.
Beam lapping zones are typically determined based on structural requirements and load distribution.
The number of beam zones can vary based on factors such as beam size, material, and span length.
Consulting structural engineers and design specifications can help determine the appropriate number of beam lapping zones.
Overlap is the area where two VDF flooring sections meet, while confined zone is the area where the VDF flooring is contained during casting process.
Overlap is the junction between two VDF flooring sections, ensuring seamless connection.
Confined zone is the area where VDF flooring is poured and contained during casting process.
Properly managing overlap and confined zone is crucial for a successful VDF flooring installa
I appeared for an interview in Mar 2025, where I was asked the following questions.
I prioritize safety through proper training, risk assessment, and adherence to protocols in all engineering tasks.
Conduct regular safety training sessions for all team members to ensure everyone is aware of potential hazards.
Implement a risk assessment process before starting any project to identify and mitigate risks.
Use personal protective equipment (PPE) such as helmets, gloves, and goggles when working in hazardous...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
G R Infraprojects interview questions for designations
Top trending discussions
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 12 May 2018
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
The duration of G R Infraprojects Senior Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 3 interviews
Interview experience
based on 59 reviews
Rating in categories
Assistant Manager
359
salaries
| ₹4.6 L/yr - ₹11.5 L/yr |
Senior Engineer
227
salaries
| ₹3.6 L/yr - ₹8.4 L/yr |
Engineer
139
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
129
salaries
| ₹6.6 L/yr - ₹16 L/yr |
Structural Engineer
122
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Larsen & Toubro Limited
Tata Projects
L&T Construction
Megha Engineering & Infrastructures