Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
Stochastic gradient descent, batch gradient descent, and gradient descent differ in the amount of data used to update the model weights.
Gradient descent updates the model weights using the entire dataset in each iteration.
Batch gradient descent updates the model weights using a subset of the dataset (batch) in each iteration.
Stochastic gradient descent updates the model weights using only one data point at a time in ea...
LLMs are large neural network models used for natural language processing tasks.
Parameters include model size, number of layers, attention mechanisms, and training data size.
Use cases include text generation, translation, summarization, and sentiment analysis.
Examples of LLMs are GPT-3, BERT, and XLNet.
The coding round lasted 90 minutes and included two questions: 1. Rotate a matrix by 90 degrees; 2. Multiply two integers without converting them from the string format to integers.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
CONTACT Automatic General is used for automatic generalization of contacts in CAD software.
Automatically generalizes contacts between different components in CAD designs
Helps in ensuring proper fit and alignment of components
Reduces manual effort in adjusting contacts between components
Improves overall design efficiency and accuracy
Material models in LS Dyna are used to simulate the behavior of different materials under various loading conditions.
Material models define how a material responds to stress, strain, temperature, and other factors.
Examples of material models in LS Dyna include MAT_024 (linear elastic), MAT_024 (plasticity), MAT_024 (viscoelastic), MAT_024 (hyperelastic), etc.
Some other contact models available in Dyna are penalty-based contact, kinematic contact, and contact stabilization.
Penalty-based contact model is used for simulating contact between deformable bodies.
Kinematic contact model is used for modeling contact between rigid bodies.
Contact stabilization is used for improving the stability of contact simulations.
I applied via Campus Placement and was interviewed before Sep 2021. There were 4 interview rounds.
It will be conducted through Hiring platform
Shortisted candidates could get a mail and this round will be conducted through Hiring platform . There will be 2 coding questions and you need to solve them and all the test cases should get passed to get selected for the next round
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
I applied via Approached by Company
Implemented and maintained network infrastructure, managed servers, and provided technical support.
Implemented network upgrades to improve performance and security
Managed Windows and Linux servers, ensuring uptime and security
Provided technical support to end users for hardware and software issues
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I participated in a product case study, and the interviewer was quite impressed by my experience. He then mentioned that he would provide positive feedback. However after this I was waiting for response and the HR told they will send me an offer letter. I was waiting for a good 4 week and then when I asked her about an update she said we have kept your cv in pipeline for future opportunities. Just one line this is really ridiculous. Bad experience
posted on 27 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There were 2 interview rounds.
Gave me a coding assignment and let them know when its done
I applied via Naukri.com and was interviewed in Sep 2024. There was 1 interview round.
Change management for supplier change involves assessing the impact, communicating with stakeholders, implementing the change, and monitoring the results.
Assess the impact of the supplier change on current processes, products, and stakeholders
Communicate the change to all relevant stakeholders, including employees, customers, and suppliers
Implement the change by updating contracts, agreements, and processes as needed
Mo...
Managing supplier delays and shortages
Dealing with unexpected delays in receiving shipments
Finding alternative suppliers to fulfill orders on time
Communicating with internal teams and customers about delays
Negotiating with suppliers for expedited shipping or additional inventory
Implementing inventory management strategies to mitigate future shortages
Low volumes will be handled by optimizing production processes, utilizing efficient inventory management, and exploring alternative suppliers.
Optimizing production processes to reduce costs associated with low volumes
Utilizing efficient inventory management to minimize excess stock and storage costs
Exploring alternative suppliers who can accommodate smaller order quantities
Implementing flexible manufacturing strategies...
Degassing in GDC casting process involves removing gases from the molten metal to improve casting quality.
Degassing is typically achieved by using a degassing unit that removes dissolved gases from the molten metal.
Common methods of degassing include rotary degassing, fluxing, and vacuum degassing.
Degassing helps prevent porosity and improve mechanical properties of the castings.
Proper degassing is essential for achiev
The number of customer events varies depending on the project and its scope.
The number of customer events can range from a few to several dozen, depending on the size and complexity of the project.
Customer events may include meetings, presentations, workshops, trainings, and feedback sessions.
Examples of customer events could be product demos, focus groups, user testing sessions, and milestone reviews.
Interview experience
based on 76 reviews
Rating in categories
Product Manager
36
salaries
| ₹10 L/yr - ₹33 L/yr |
Senior Software Engineer
33
salaries
| ₹8.5 L/yr - ₹21.5 L/yr |
Software Engineer
30
salaries
| ₹5.7 L/yr - ₹20.2 L/yr |
Project Manager
25
salaries
| ₹18 L/yr - ₹32 L/yr |
Project Lead
19
salaries
| ₹14.2 L/yr - ₹22 L/yr |
IBM
Accenture
TCS
Infosys