Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Essar Group Team. If you also belong to the team, you can get access from here

Essar Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Essar Group Assistant Engineer - Civil Interview Questions and Answers

Updated 16 Apr 2022

Essar Group Assistant Engineer - Civil Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Why should we hire you?
  • Q3. Tell me about company?

Interview Preparation Tips

Topics to prepare for Essar Group Assistant Engineer - Civil interview:
  • AutoCAD
Interview preparation tips for other job seekers - I WORKED HONESTLY,VERY ACTIVE IN WORK

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basic knowledge about civil engineering.Interviw about based on previous experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is very good,please before going to the interview once check all the previous work details,and practical knowledge.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Deduction rules for plastering
  • Ans. 

    Deduction rules for plastering in civil engineering

    • Deductions are made for openings like doors and windows

    • Deductions are made for thickness of plaster

    • Deductions are made for uneven surfaces

    • Deductions are made for wastage of material

    • Deductions are made for scaffolding

    • Example: If the area to be plastered is 100 sq. ft. and the area of openings is 20 sq. ft., then the net area for plastering will be 80 sq. ft.

  • Answered by AI
  • Q2. Deduction rules for concrete
  • Ans. 

    Deduction rules for concrete

    • Deductions are made to account for the shrinkage and settlement of concrete

    • The deduction rate varies based on the type of concrete and the environmental conditions

    • Typically, a deduction of 1/8 inch per 10 feet is made for normal weight concrete

    • For lightweight concrete, the deduction rate is 1/4 inch per 10 feet

    • The deductions are made from the specified dimensions of the concrete element

  • Answered by AI
  • Q3. Price Escalation bill

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for deduction rules used for quantity estimation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Stractural analysis, oht , pipe distribution laying, auto level, boundary wall, pump house full finishing, chamber,drain,d.g,solar pedastal, drawing, bbs,pcc, raft, invert beam,it
  • Q2. Oht Excavation, layout marking,pcc, raft,invert beam, column, reinforcement,it all,
  • Q3. Pump house reinforcement, marking, layout,pcc, brick work,dpc, plinth protection, appron, chamber, drawing bbs, drainage system,it
  • Q4. Good problem solving contractor skills and good work right time, good apportunity aur response both work,and friendly attitude it's

Interview Preparation Tips

Interview preparation tips for other job seekers - I like your company and right time work complete and good problem solving skills
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Self introduction
  • Q2. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - NCC is good company
Work cluter is very good
Management is good
I am happy with my job and organisation
Thanks
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. 16 mm dia steel 1m weight
  • Q2. 1.580 kg/M in 16 mm dia steel
  • Q3. Concrete slump at site
  • Ans. 

    Concrete slump is a measure of consistency of freshly mixed concrete.

    • It is measured by the slump test, which involves filling a metal cone with concrete and then removing the cone to see how much the concrete slumps or settles.

    • The slump value can indicate whether the concrete is too wet or too dry, and can affect the strength and durability of the finished product.

    • The ideal slump value depends on the specific applicati...

  • Answered by AI
  • Q4. 120mm to 150mm at site

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview questions not depending at site.but all interview questions in book
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About current company
Round 2 - Technical 

(3 Questions)

  • Q1. About is codes of building construction
  • Q2. Current job responsibilities..... related questions
  • Q3. About bar bending shedule , lab test
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Current job responsibilities.......
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Past work experience
  • Ans. 

    I have 3 years of experience working as a civil engineer for a construction company.

    • Managed multiple construction projects simultaneously

    • Performed site inspections and ensured compliance with building codes

    • Collaborated with architects and contractors to resolve design issues

  • Answered by AI
  • Q2. Salary expectations

I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Upto how many kV substation are completed you .
  • Ans. 

    I have completed substation projects up to 220 kV.

    • I have experience in completing substation projects up to 220 kV.

    • I have successfully completed multiple substation projects ranging from 33 kV to 220 kV.

    • I am familiar with the design and construction requirements of substation projects up to 220 kV.

    • I have worked on substation projects involving transformers, switchgear, and control systems up to 220 kV.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for KEC International Assistant Engineer - Civil interview:
  • Substation
  • Civil Construction
Interview preparation tips for other job seekers - Job seekers are good . I searched many more job in job seekers.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Basic knowledge of construction work and according to your experience what work had you done in previous company because they ask you according to your CV.
  • Q2. Estimation and costing
  • Q3. Bar bending schedule must be known
  • Q4. Structure analysis should have

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer - Civil interview:
  • Structural Analysis
  • Quantity Estimation
  • Building Material
  • AutoCAD
Interview preparation tips for other job seekers - Bending moment.
Covering block.
Cement required for 1 sqm of plaster work.
Concrete work as per IS CODE.
IS Code should be known.
Development length.
Overlap length.
Weight of steel bar.
Volume of cement.
Etc.

Essar Group Interview FAQs

How many rounds are there in Essar Group Assistant Engineer - Civil interview?
Essar Group interview process usually has 1 rounds. The most common rounds in the Essar Group interview process are HR.

Tell us how to improve this page.

Essar Group Assistant Engineer - Civil Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

5.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
82 salaries
unlock blur

₹2.4 L/yr - ₹8.4 L/yr

Deputy Manager
75 salaries
unlock blur

₹4.7 L/yr - ₹14 L/yr

Manager
73 salaries
unlock blur

₹7.3 L/yr - ₹25 L/yr

Senior Manager
44 salaries
unlock blur

₹9.5 L/yr - ₹30.2 L/yr

Deputy General Manager
19 salaries
unlock blur

₹13 L/yr - ₹45.5 L/yr

Explore more salaries
Compare Essar Group with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview