Filter interviews by
Cut off level of pile is the predetermined level at which the pile is cut off during construction.
Cut off level of pile is determined based on the design requirements and soil conditions.
It is important to ensure that the cut off level is accurately maintained to provide proper support for the structure.
Examples of cut off levels for piles can vary depending on the project, such as at ground level or below ground level...
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
Quality aspects for good quality of concrete include proper mix design, adequate curing, and testing.
Proper mix design with appropriate proportions of cement, aggregates, and water
Adequate curing to ensure strength development and prevent cracking
Testing of concrete for compressive strength, workability, and durability
Use of quality materials and proper construction practices
Regular inspection and maintenance of concre
Concrete cubes are casted at regular intervals to ensure quality control.
The frequency of casting concrete cube depends on the project specifications and requirements.
Generally, cubes are casted at 7 days, 14 days, and 28 days after pouring the concrete.
The cubes are tested for compressive strength to ensure the concrete meets the required standards.
If the cubes fail to meet the required strength, corrective measures a
The deviation in compressive strength of concrete cube depends on various factors.
The deviation can be affected by factors such as the quality of materials used, curing conditions, testing procedures, and age of concrete.
The standard deviation of compressive strength for a set of 6 cubes is generally considered to be around 5-10% of the average strength.
The deviation can also be influenced by the size and shape of the ...
Factors affecting safety at site include human error, equipment failure, weather conditions, and lack of training.
Human error such as negligence, carelessness, and lack of attention to detail
Equipment failure due to poor maintenance or malfunction
Weather conditions such as rain, snow, or extreme heat
Lack of training or experience in handling equipment or performing tasks
Inadequate safety measures or procedures
Poor comm...
Top trending discussions
based on 4 interviews
Interview experience
based on 15 reviews
Rating in categories
Deputy Manager
168
salaries
| ₹6 L/yr - ₹20.5 L/yr |
Senior Manager
111
salaries
| ₹15.5 L/yr - ₹42 L/yr |
Senior Engineer
94
salaries
| ₹5.5 L/yr - ₹12.5 L/yr |
Piping Designer
92
salaries
| ₹4 L/yr - ₹15 L/yr |
Engineer
83
salaries
| ₹1.2 L/yr - ₹9.1 L/yr |
BHEL
Oil And Natural Gas Corporation
Hindustan Petroleum
GAIL