Engineers India
Bharat Serums and Vaccines Interview Questions and Answers
Q1. What are the quality aspect to assure good quality of concrete?
Quality aspects for good quality of concrete include proper mix design, adequate curing, and testing.
Proper mix design with appropriate proportions of cement, aggregates, and water
Adequate curing to ensure strength development and prevent cracking
Testing of concrete for compressive strength, workability, and durability
Use of quality materials and proper construction practices
Regular inspection and maintenance of concrete structures
Q2. What is the deviation in compressive strength of concrete cube?
The deviation in compressive strength of concrete cube depends on various factors.
The deviation can be affected by factors such as the quality of materials used, curing conditions, testing procedures, and age of concrete.
The standard deviation of compressive strength for a set of 6 cubes is generally considered to be around 5-10% of the average strength.
The deviation can also be influenced by the size and shape of the cube, as well as the location from where the sample is tak...read more
Q3. What are the frequency for casting concrete cube?
Concrete cubes are casted at regular intervals to ensure quality control.
The frequency of casting concrete cube depends on the project specifications and requirements.
Generally, cubes are casted at 7 days, 14 days, and 28 days after pouring the concrete.
The cubes are tested for compressive strength to ensure the concrete meets the required standards.
If the cubes fail to meet the required strength, corrective measures are taken to improve the quality of the concrete.
Q4. What are the factors affecting safety at site?
Factors affecting safety at site include human error, equipment failure, weather conditions, and lack of training.
Human error such as negligence, carelessness, and lack of attention to detail
Equipment failure due to poor maintenance or malfunction
Weather conditions such as rain, snow, or extreme heat
Lack of training or experience in handling equipment or performing tasks
Inadequate safety measures or procedures
Poor communication among workers or between workers and management
E...read more
Q5. What is cut of level of pile ? Diffeerent types of is codes? Quality tests on fresh concrete Doocumentation requirements
Cut off level of pile is the predetermined level at which the pile is cut off during construction.
Cut off level of pile is determined based on the design requirements and soil conditions.
It is important to ensure that the cut off level is accurately maintained to provide proper support for the structure.
Examples of cut off levels for piles can vary depending on the project, such as at ground level or below ground level.
Quality tests on fresh concrete include slump test, compr...read more
Q6. How to deal different types of problems?
Different types of problems can be dealt with by analyzing the root cause, brainstorming solutions, seeking input from others, and implementing the most effective solution.
Identify the root cause of the problem before attempting to solve it.
Brainstorm potential solutions and evaluate their feasibility.
Seek input from colleagues or experts in the field for different perspectives.
Implement the most effective solution and monitor its effectiveness for any necessary adjustments.
E...read more
Q7. How to manage Decission making quality?
Decision making quality can be managed by setting clear criteria, gathering relevant information, considering alternatives, and seeking input from stakeholders.
Set clear criteria for decision making to ensure alignment with project goals
Gather relevant information from various sources to make informed decisions
Consider multiple alternatives and evaluate their potential outcomes
Seek input from stakeholders to gain different perspectives and ensure buy-in
Use decision-making too...read more
Q8. How to increase productivity ?
Increasing productivity can be achieved through effective time management, delegation of tasks, setting clear goals, providing training and resources, and fostering a positive work environment.
Implement time management techniques such as prioritizing tasks and setting deadlines
Delegate tasks to team members based on their strengths and expertise
Set clear and achievable goals for individuals and teams
Provide training and resources to enhance skills and knowledge
Create a positi...read more
More about working at Engineers India
Top Senior Civil Engineer Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month