I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Nov 2019. There were 3 interview rounds.
The volume of cement required for preparing 1 cubic meter of concrete depends on the mix ratio.
The mix ratio determines the proportion of cement in the concrete mix.
Common mix ratios for concrete are 1:2:4, 1:3:6, and 1:4:8.
For example, in a 1:2:4 mix ratio, the volume of cement required would be 1/7th of the total volume of concrete.
So, for 1 cubic meter of concrete, the volume of cement required would be approximatel
The question is unclear and lacks context. Please provide more information.
What type of dumpers are being referred to?
What is the context of the question?
Is there a specific project or location being discussed?
What is the purpose of knowing the total capacity of dumpers in brass?
Without more information, it is impossible to provide a meaningful answer.
To calculate volume of piles, use geometric formulas. For steel detailing, use CAD software and follow industry standards.
For piles, calculate volume using formulas such as V = πr²h or V = Bh where B is the base area and h is the height.
For steel detailing, use CAD software such as AutoCAD or Tekla Structures and follow industry standards such as AISC or BS EN.
Steel detailing involves creating detailed drawings and spe...
Top trending discussions
I applied via campus placement at Sarvajanik College of Engineering and Technology, Surat and was interviewed in Jun 2023. There were 8 interview rounds.
Prepare for the interview properly
Coding should be well prepared
Don't stay silent atleast should speak something
Know the recent technology in the market
posted on 28 Oct 2023
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 4 interview rounds.
String , Array ,Collection framework related questions.
Ecommerce site with Login,Review,AddToCart,Order features,Filter features.
I applied via Referral and was interviewed in Feb 2023. There were 3 interview rounds.
We were well trained and explained about the work, the different perspectives of pursuing the respective and how to impact positively through our work. It imbibed an insight in our minds with the aim of pursuing work with all dedication not just to acquire profit but also for the greater social cause.
We were given tasks and we're required to submit in a refered deadline.
posted on 7 Feb 2023
I applied via Company Website and was interviewed in Jan 2023. There were 4 interview rounds.
Simple aptitude just for filtering
posted on 31 Mar 2023
Half day coding exercise with buddy and given code, which you have to modify according to problem statement. Objective is to see how quickly you can grasp a new language (gives 1 week with learning materials) and logical thinking
Pain points of a weather app
Inaccurate weather forecasts
Slow loading time
Confusing user interface
Lack of customization options
Limited location options
Prioritization: Fixing inaccurate forecasts and improving loading time should be top priority
Interview experience
based on 14 reviews
Rating in categories
Junior Engineer
7
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Store Keeper
5
salaries
| ₹1.4 L/yr - ₹3.2 L/yr |
Senior Engineer
4
salaries
| ₹4.8 L/yr - ₹6 L/yr |
Project Coordinator
4
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Civil Site Engineer
4
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure