The volume of cement required for preparing 1 cubic meter of concrete depends on the mix ratio.
The mix ratio determines the proportion of cement in the concrete mix.
Common mix ratios for concrete are 1:2:4, 1:3:6, and 1:4:8.
For example, in a 1:2:4 mix ratio, the volume of cement required would be 1/7th of the total volume of concrete.
So, for 1 cubic meter of concrete, the volume of cement required would be approximatel
The question is unclear and lacks context. Please provide more information.
What type of dumpers are being referred to?
What is the context of the question?
Is there a specific project or location being discussed?
What is the purpose of knowing the total capacity of dumpers in brass?
Without more information, it is impossible to provide a meaningful answer.
To calculate volume of piles, use geometric formulas. For steel detailing, use CAD software and follow industry standards.
For piles, calculate volume using formulas such as V = πr²h or V = Bh where B is the base area and h is the height.
For steel detailing, use CAD software such as AutoCAD or Tekla Structures and follow industry standards such as AISC or BS EN.
Steel detailing involves creating detailed drawings and spe...
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2022. There were 3 interview rounds.
General Apptitude,skills, AutoCAD and others
based on 2 reviews
Rating in categories
Junior Engineer
7
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Store Keeper
5
salaries
| ₹1.4 L/yr - ₹3.2 L/yr |
Senior Engineer
4
salaries
| ₹4.8 L/yr - ₹6 L/yr |
Project Coordinator
4
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Civil Site Engineer
4
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure