Upload Button Icon Add office photos

Filter interviews by

DVP INFRA PROJECTS Civil Foreman Interview Questions and Answers

Updated 8 Feb 2024

DVP INFRA PROJECTS Civil Foreman Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. What you done in past.tell about...
  • Q2. Which company you were in....
  • Q3. What you done on those company...
  • Q4. Which site you were in...

Interview Preparation Tips

Topics to prepare for DVP INFRA PROJECTS Civil Foreman interview:
  • QUALIFICATIONS
  • Experience
Interview preparation tips for other job seekers - Should tell always truth..never make a false answer..it will make danger...

Interview questions from similar companies

I was interviewed before Feb 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Case Study 

12th

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil formen ho m mari ko job ki jarurt h
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(7 Questions)

  • Q1. Quality and material control
  • Q2. Work Productivity
  • Q3. Rre_productivity
  • Q4. Post product activity
  • Q5. Good knowledge and good behaviour
  • Q6. Pre_productivity
  • Q7. Post productivity

Interview Preparation Tips

Interview preparation tips for other job seekers - PSP PROJECT LMT
Civil Foreman
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Labournet services India Pvt Ltd
Senior Civil Trainer
Working as a Civil construction Trainer.
Certified in Assistant mason and Shuttering carpentery trade by NSDC.
Worked in multiple Skill development projects.
NAREDCO, PMKVY, BOCW and Morth.
Trained more than 500 labourers under skill development program.
L&T Construction
Civil Supervisor
Responsible for All works at Building Construction.
Barbending, Shuttering carpentery, Masonry and finishing works.
Responsible for work done with good productivity.
Al Jaber Group Dubai UAE
Chargehand
Worked as a chargehand with the team of 15 labour.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Al Jaber Group Dubai UAE
Civil Foreman
Worked as a Civil Formen with the team of 15 labour.
Barbending, Shuttering carpentery, Masonry and finishing works.
Completed on time construction works.
Responsible for Barbending works completion as per drawing.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Monster and was interviewed before May 2020. There were 5 interview rounds.

Round 1 - Civil site activity 

(2 Questions)

  • Q1. Earth work activity
  • Q2. Road activity embt. Subgrad bes GSB , wmm DBM
Round 2 - One-on-one 

(3 Questions)

  • Q1. Concrete pouring
  • Q2. Earth work of road
  • Ans. 

    Earth work of road involves excavation, filling, compaction, and shaping of the ground to create a stable foundation for the road.

    • Excavation is the process of removing soil and rocks to create space for the road.

    • Filling involves adding suitable materials like gravel or crushed stones to level the ground.

    • Compaction is essential to ensure the filled materials are tightly packed and stable.

    • Shaping the ground involves grad...

  • Answered by AI
  • Q3. Pedestal j bolting
Round 3 - Group Discussion 

Descusosin of road concreting Massonary work

Round 4 - HR 

(2 Questions)

  • Q1. Noida international airport Noida
  • Q2. Airside Earth work activity
Round 5 - Group Discussion 

Discuss of site civil activities

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil site working experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is well foundation and tilt shift method
  • Ans. 

    Well foundation is a type of foundation used in civil engineering while tilt shift method is a photography technique.

    • Well foundation is a type of deep foundation used to support heavy structures on soft soil or water bodies.

    • It consists of a large diameter well-like structure made of concrete or steel, which is sunk into the ground or waterbed.

    • The space inside the well is then filled with concrete or stone to provide a ...

  • Answered by AI
  • Q2. What is segment lifting proseger
  • Ans. 

    Segment lifting process is a technique used in construction to lift and place precast concrete segments for bridge construction.

    • It involves the use of cranes and specialized lifting equipment.

    • The segments are lifted and placed in a predetermined sequence to form the bridge deck.

    • This process is faster and more efficient than traditional bridge construction methods.

    • Examples of projects that have used segment lifting incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please give me chance for working with you I'm specialist for bridge project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.

Interview Questionnaire 

1 Question

  • Q1. Structure work
Round 1 - Technical 

(1 Question)

  • Q1. Type of Pile Foundation
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer heavy loads of structures to deeper soil or rock strata.

    • Pile foundation can be classified into two types: end-bearing piles and friction piles.

    • End-bearing piles transfer the load of the structure to a hard layer of rock or soil at the bottom of the pile.

    • Friction piles transfer the load of the structure to the soil around the pile through skin friction.

    • Common...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil work hard working be active think positively

I applied via Company Website and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical questions .structure work
Related.like road bridge and building.

DVP INFRA PROJECTS Interview FAQs

How many rounds are there in DVP INFRA PROJECTS Civil Foreman interview?
DVP INFRA PROJECTS interview process usually has 1 rounds. The most common rounds in the DVP INFRA PROJECTS interview process are HR.

Tell us how to improve this page.

DVP INFRA PROJECTS Civil Foreman Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 428 Interviews
AmbitionBox Interview Questions
4.9
 • 151 Interviews
HCL Infosystems Interview Questions
3.9
 • 140 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
Data Entry Interview Questions
4.1
 • 97 Interviews
HyScaler Interview Questions
4.5
 • 91 Interviews
View all
Junior Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Keeper
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Coordinator
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare DVP INFRA PROJECTS with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview