Filter interviews by
Be the first one to contribute and help others!
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
Process gear oil replacement is the procedure of draining out old gear oil from a system and refilling it with fresh gear oil.
Drain out old gear oil from the system
Ensure proper disposal of the old gear oil
Refill the system with fresh gear oil
Follow manufacturer's guidelines for the type and amount of gear oil to be used
posted on 28 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
Design and standards for drafting a diagram involve following established guidelines and principles.
Designing a diagram involves understanding the purpose and audience of the diagram.
Standards for drafting a diagram include using appropriate symbols, labels, and dimensions.
Diagrams should be clear, concise, and accurately represent the intended information.
Following industry-specific standards and conventions is import...
posted on 7 Feb 2022
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in May 2020. There was 1 interview round.
Activities at site with safety rules
Conducting regular safety inspections
Providing personal protective equipment (PPE) to workers
Ensuring proper training of workers on safety procedures
Maintaining proper signage and warnings
Implementing emergency response plans
Enforcing strict adherence to safety rules and regulations
Regularly reviewing and updating safety policies and procedures
Handling off cranes at site involves proper planning, coordination and safety measures.
Ensure proper communication between crane operator and ground personnel
Inspect crane and rigging equipment before use
Ensure proper weight distribution and load capacity
Use proper hand signals and follow safety protocols
Train personnel on proper crane operation and safety measures
Examples: lifting heavy equipment, materials, or struct
I applied via LinkedIn and was interviewed before Mar 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Dec 2019. There were 5 interview rounds.
A funnel drawing sketch is required with top and front view.
Start by drawing a trapezoid shape for the top view
Add a curved shape for the funnel body
Draw a circle for the bottom of the funnel
For the front view, draw a straight line for the height of the funnel
Connect the top and bottom of the line with a curved shape
Add any necessary details such as a handle or spout
Heat treatment involves heating and cooling of metals to alter their properties. FE-C equilibrium diagram shows the relationship between carbon content and temperature in steel.
Heat treatment is used to improve the mechanical properties of metals.
It involves heating the metal to a specific temperature and then cooling it at a specific rate.
FE-C equilibrium diagram shows the phases of steel at different temperatures and...
Deputy Manager
238
salaries
| ₹5.2 L/yr - ₹17 L/yr |
Senior Engineer
157
salaries
| ₹4 L/yr - ₹12 L/yr |
Manager
151
salaries
| ₹7.2 L/yr - ₹23 L/yr |
Engineer
88
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Senior Manager
65
salaries
| ₹10 L/yr - ₹32 L/yr |
BHEL
Thermax Limited
Siemens
Alstom Transportation